Structure for preventing differential settlement of shield tunnel and implementing method
A technology of shield tunneling and implementation method, which is applied in tunnels, tunnel lining, earthwork drilling, etc., can solve the problems of large-capital shield tunneling and ineffective implementation, and achieves stability, avoidance of uneven settlement, and stable connection. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The specific embodiments of the present invention are described below so that those skilled in the art can understand the present invention, but it should be clear that the present invention is not limited to the scope of the specific embodiments. For those of ordinary skill in the art, as long as various changes Within the spirit and scope of the present invention defined and determined by the appended claims, these changes are obvious, and all inventions and creations using the concept of the present invention are included in the protection list.
[0027] like figure 1 and figure 2 As shown, the structure to prevent the uneven settlement of the shield tunnel includes an arc-shaped bottom support segment 1 and several arc-shaped ordinary support segments, the bottom support segment 1 and several ordinary support segments are assembled into a tunnel, and the bottom support segment 1 is installed at the bottom of the tunnel, and an air bag 6 is installed on the outside...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com