Unlock instant, AI-driven research and patent intelligence for your innovation.

Mounting process of steel structure pre-buried bolt

A technology of pre-embedded bolts and installation technology, which is applied in the direction of basic structure engineering, construction, etc., and can solve the problems affecting the verticality of upper steel components, squareness, column-beam connection accuracy, very high requirements for pre-embedded accuracy, and affecting the installation quality of steel structures. and other problems, to achieve the effect of saving labor, high pre-embedded precision, and ensuring axis displacement

Inactive Publication Date: 2016-05-04
ANHUI WEIHONG STEEL STRUCTURE GRP
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The pre-embedded bolt installation process in the prior art determines the appropriate installation method according to the different space dimensions and construction requirements of the steel structure. The pre-embedded bolt is the basis for the installation of the upper steel structure project, which directly affects the verticality, Squareness and column-beam connection accuracy will affect the installation quality of the steel structure. The accuracy of pre-embedding is very high. For the occasions with large construction area and dense installation of pre-embedded parts, it is difficult to locate and fix the bolts.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0014] A steel structure embedded bolt installation process, comprising the following steps:

[0015] 1. Determine the pre-embedded position of the pre-embedded bolts and pop up the positioning axis of the pre-embedded bolts, and bind the steel bars into a reinforcement cage according to the requirements.

[0016] 2. Check the size of the pre-embedded bolt skeleton, put the pre-embedded bolts into the steel cage, insert the positioning steel formwork, adjust the positioning axis of the positioning steel formwork, put nuts on the screw rod, adjust the height of the top of the screw rod to the control position, and the height of a column head After the elevation of the pre-embedded bolts and the positioning of the axis are completed, check the column spacing of two adjacent columns. After the axis is checked and correct, the bolts are welded to the main reinforcement of the reinforcement cage. The welding is carried out by the black pole argon arc welding method to ensure that th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a mounting process of steel structure pre-buried bolts. The mounting process comprises the following steps: determining the pre-buried positions of the pre-buried bolts and ejecting out the positioning axes of the pre-buried bolts, and binding reinforcements into a reinforcement cage according to the requirement; checking the skeleton sizes of the pre-buried bolts, placing the pre-buried bolts in the reinforcement cage, sleeving the pre-buried bolts by a positioning steel formwork, adjusting the positioning axis of the positioning steel formwork, and welding the pre-buried bolts with the main reinforcements of the reinforcement cage; after the mounting and fixing of the pre-buried bolts are completed, detaching the positioning steel formwork, and checking the plane positions and the elevations of the pre-buried bolts; conducting pouring of foundation concrete; and after final setting of the foundation concrete, cleaning all the pre-buried bolts thoroughly, smearing with solid grease, and tightly packing with an adhesive tape. The mounting process has the advantages that the mounting process is simple, the pre-burying precision is high, the pre-buried bolts do not shift and sink, concrete is uniform in strength, the integrality is high, the anti-drawing strength and the shearing strength are high, and the construction is convenient, not only is the axes displacement of the pre-buried bolts ensured, but also the mounting speed of the pre-buried bolts can be increased, and labor and time are saved.

Description

technical field [0001] The invention belongs to the field of pre-embedded bolt installation, in particular to a steel structure pre-embedded bolt installation process. Background technique [0002] Due to the advantages of high strength, light weight, good seismic performance, fast construction speed and high degree of industrialization, the steel structure has been developed rapidly. The installation accuracy of steel support columns and embedded bolts of steel structure buildings has gradually become a key process of construction, otherwise there will be deviations exceeding the allowable deviation of the specifications and even lead to serious defects that the bolts cannot enter the holes. The pre-embedded bolt installation process in the prior art determines the appropriate installation method according to the different space dimensions and construction requirements of the steel structure. The pre-embedded bolt is the basis for the installation of the upper steel structu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/42
CPCE02D27/42
Inventor 曹雁冰
Owner ANHUI WEIHONG STEEL STRUCTURE GRP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More