Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof

A technology for reinforced concrete slabs and rock mass of suspension bridges, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as difficult coordination of the output of anchor cables and anchor plug bodies, so as to reduce the amount of concrete construction and reduce the impact , The effect of improving durability

Active Publication Date: 2016-06-08
CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a composite anchorage of suspension bridge rock mass and reinforced concrete slab and its construction method, which can replace the tunnel anchor and solve the problem that the output of the anchor cable and the anchor plug body is not easy to coordinate. The rock mass is used to replace the reinforced concrete anchor plug body, and the rock mass’s own resistance is fully utilized to transfer the load of the main cable of the suspension bridge directly to the rock mass through the anchor cable and the reinforced concrete anchor plate of the rear anchor chamber. Its performance is safe and reliable, cost-effective, and beneficial environmental protection

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof
  • Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof
  • Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The specific implementation manners of the technical solutions in the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention.

[0024] like figure 1 and figure 2 A suspension bridge rock mass and reinforced concrete slab composite anchorage is shown, which is characterized in that it includes a front anchor chamber 2 excavated on one side or both sides of the suspension bridge and a rear anchor chamber 7 excavated in the mountain body. The reserved rock mass 8 placed between the front and rear anchor chambers 2 and 7 and the multiple anchor cables 11 scattered between the front and rear anchor chambers 2 and 7, the front anchor chamber 2 is smaller than the rear anchor chamber 7, resulting in The reserved rock mass 8 between the front and rear anchor chambers 2 and 7 is wedge-shaped with a small front and a large rear. A reinforced concrete anchor plate 10 is poured in the rear anchor cha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a suspension bridge rock mass and reinforced concrete plate composited type anchorage and a construction method thereof. The construction method comprises the steps that 1, the composited type anchorage is located on one side or the two sides of a suspension bridge, a front anchor chamber is excavated on the side slope side of a mountain, a worker enters the mountain through a construction hole with a small cross section to excavate a back anchor chamber, and rock masses between the front anchor chamber and the back anchor chamber are reserved to replace a reinforced concrete anchor plug; 2, hole sites are quincuncially arranged in the front anchor surface and the back anchor surface, and anchor cable holes are drilled from the front anchor surface to the back anchor chamber; 3, a reinforced concrete anchor plate is poured in the back anchor chamber, and anchor holes are reserved; 4, anchor cables penetrate through the reserved rock masses and the reinforced concrete anchor plate to the back anchor chamber through the anchor cable holes from the front anchor chamber and are anchored; and 5, a main cable is connected with the anchor cables through a cable splaying saddle. According to the suspension bridge rock mass and reinforced concrete plate composited type anchorage and the construction method thereof, the resistance of the rock masses is made full use of, excavation of large-size earth rock is avoided, construction of large-size concrete is reduced, the influence on the bridge area ecological environment is small, the construction cost of the composited type anchorage is significantly reduced compared with a tunnel type anchorage, and economic benefits are great.

Description

technical field [0001] The invention belongs to the technical field of bridge engineering and relates to the design and construction of suspension bridge anchors, in particular to a composite anchor of suspension bridge rock mass and reinforced concrete slab and a construction method thereof. Background technique [0002] At present, the anchorage types of suspension bridges include gravity anchors, tunnel anchors, and composite anchorages of gravity anchors (tunnel anchors) + anchor cables. Gravity anchors are used in soil and weak rock foundations, relying on the friction between their own weight and the foundation to resist the tension of the main cable. The amount of earthwork excavation and concrete construction is large, and the impact on the ecological environment is also great. Tunnel-type anchorage is often used in canyon areas with relatively hard and complete rock mass. It transmits most of the tension in the main cable to the surrounding rock through the anchor p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 邬爱清余美万张奇华肖国强周黎明陈昊李玉婕罗荣王法刚罗洁付代光张扬边智华崔建华杨伟钟敬全陈锦杨君易天佐陈彤
Owner CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products