Underground Diaphragm Wall Airbag Type Interface Box and Using Method
A technology for underground diaphragm walls and interface boxes, which is applied in sheet pile walls, buildings, and foundation structure engineering. It can solve problems such as affecting the tightness of interfaces, cumbersome operations, and waste, and achieves improved material utilization, wide application range, The effect of easy operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A method for using an interface box, comprising the following steps: (1), processing of the airbag 3: the section of the airbag 3 is processed according to the size of the interface groove 2, the length of the airbag 3 is according to the length of the ground connection wall, and the upper end of the airbag 3 is welded and drawn Lifting handle 5, the cross-sectional size of air bag 3 is slightly greater than the size of interface groove 2, and the length of air bag 3 is 1 meter longer than the ground connection wall; (2), steel bar processing: the steel bar is bound according to the drawing of the ground connection wall to form the described Reinforcing cage 1, described interface groove 2 is welded on the both sides of reinforcing cage 1, and in interface groove 2 outside according to the spacing of 1.5 meters weld buckle fixed rib 4; (3), air bag 3 is installed: uninflated air bag 3. Place the upper end of the interface slot 2 in the interface slot 2, start to inflate ...
Embodiment 2
[0023] A method for using an interface box, comprising the following steps: (1), processing of the airbag 3: the section of the airbag 3 is processed according to the size of the interface groove 2, the length of the airbag 3 is according to the length of the ground connection wall, and the upper end of the airbag 3 is welded and drawn Lifting handle 5, the cross-sectional size of air bag 3 is slightly greater than the size of interface groove 2, and the length of air bag 3 is 2 meters longer than the ground connection wall; (2), steel bar processing: the steel bar is bound according to the drawing of the ground connection wall to form the described Reinforcement cage 1, described interface groove 2 is welded on the both sides of reinforcement cage 1, and in interface groove 2 outside, according to the spacing of 2 meters welding buckle fixed rib 4; 3. Place the upper end of the interface slot 2 in the interface slot 2, start to inflate slowly, and keep tidying up during the in...
Embodiment 3
[0025] A method for using an interface box, comprising the following steps: (1), processing of the airbag 3: the section of the airbag 3 is processed according to the size of the interface groove 2, the length of the airbag 3 is according to the length of the ground connection wall, and the upper end of the airbag 3 is welded and drawn Lifting handle 5, the cross-sectional size of air bag 3 is slightly greater than the size of interface groove 2, and the length of air bag 3 is 1 meter longer than the ground connection wall; (2), steel bar processing: the steel bar is bound according to the drawing of the ground connection wall to form the described Reinforcement cage 1, described interface groove 2 is welded on the both sides of reinforcement cage 1, and in interface groove 2 outside, according to the spacing of 2 meters welding buckle fixed rib 4; 3. Place the upper end of the interface slot 2 in the interface slot 2, start to inflate slowly, and keep tidying up during the inf...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com