A kind of electronic control board black box test case generation and automatic test method
A black-box testing and test case technology, applied in software testing/debugging, error detection/correction, electrical and digital data processing, etc. The effect of optimizing the running speed and the transmission quality of the signal
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as figure 1As shown, a black box test case generation and automatic test system for an electric control board, including a computer, a master control chassis and an interface board, the computer is connected to a printer, and a software system is built in the computer, and the software system includes a test case module for generating test cases , Automatic test and judgment module based on binary tree traversal algorithm, test report and data playback module, test case module includes test case management tree diagram and test execution module, test case management tree diagram manages test cases from top to bottom Sample layer, function module layer, test item layer and test step layer four-layer structure, in which the sample layer is used to manage black box test cases of different electric control boards, a black box test case of an electric control board contains M functional modules, a The functional module contains N test items, one test item contains S tes...
Embodiment 2
[0032] A method for producing and automatically testing black-box test cases for an electric control board, comprising the following steps:
[0033] S1. Add test items such as functional modules, test items and test steps required for testing the electric control board in the test case management tree diagram of the test case module;
[0034] S2. Edit the test execution module. The editing content includes setting the dummy variables and physical variables to be tested, setting the expected values of the dummy variables and the physical variables, setting the test values and expected values of the dummy variables and the physical variables, and completing the judgment The agreed time, the order of setting dummy variables and entity variables for judgment, and the length of running time to complete a test step, the set values in the four sub-modules of the conventional judgment module, timing judgment module, timing judgment module and test step duration module correspon...