Unlock instant, AI-driven research and patent intelligence for your innovation.

Tower crane plane arranging system and method based on BIM (building information modeling) technology

A plane layout and tower crane technology, applied in the direction of load hanging components, cranes, transportation and packaging, etc., can solve the problems that affect the construction period, cannot be found, and increase construction costs, so as to achieve good construction costs, improve rationality, and improve efficiency Effect

Active Publication Date: 2016-07-06
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF5 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to overcome the defects of the prior art, provide a tower crane plane layout system and method based on BIM technology, and solve the problem that the tower crane has nothing to do with the components within its own range in the prior art when the site layout is unrelated. The weight exceeds the lifting capacity of the tower crane and cannot be found, which will increase the construction cost and affect the construction period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tower crane plane arranging system and method based on BIM (building information modeling) technology
  • Tower crane plane arranging system and method based on BIM (building information modeling) technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

[0031] The invention provides a tower crane plane layout system and method based on BIM technology, which is suitable for the site plane layout before construction, and aims to improve the intelligence and efficiency of the tower crane in the site plane layout. The present invention adds the weight attribute to the attributes of the components within the range of the tower crane, and the tower crane gives the allowable hoisting weight according to the distance between the boom and the tower body. When the weight exceeds the allowable hoisting weight of the tower crane at this distance, an error message will be reported, so that the operator can make adjustments. The system and method for the layout of tower cranes based on the BIM technology of the present invention will be described below with reference to the accompanying drawings.

[0032] se...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a tower crane plane arranging system and method based on a BIM (building information modeling) technology. The system comprises a modeling unit, an acquiring unit, a plane arranging unit and a sling load checking unit, wherein the modeling unit models member which needs to be hoisted and increases the weight parameter of the member; the acquiring unit is used for storing the set parameter and the sling load parameter of a tower crane; the plane arranging unit is used for carrying out plane arrangement of the member modeled by the modeling unit; the sling load checking unit is used for carrying sling load check of the member after plane arrangement; during sling load check, whether the weight value of the member arranged within the coverage area of the tower crane is in the sling load value of the tower crane is checked thoroughly; if the weight value of the member is higher than the sling load value of the tower crane, a prompt of an error message is made; otherwise, a next member is checked until the going-over is finished. The member is entitled to the weight parameter; and after the site is arranged, comparison of the sling load of the tower crane and the weight of the member is carried out, so that the sling load check within the coverage area of the tower crane is achieved, and intelligent plane arrangement is achieved.

Description

technical field [0001] The invention relates to the field of building construction, in particular to a tower crane plane layout system and method based on BIM technology. Background technique [0002] BIM (Building Information Modeling, Building Information Modeling) technology is a data-based tool applied to engineering design and construction management. It integrates relevant information of various projects through parametric models, and is shared and maintained in the whole life cycle process of project planning, operation and maintenance. Transmission, so that engineers and technicians can correctly understand and efficiently respond to various building information, provide the basis for collaborative work for the design team and all construction entities including the construction operation unit, and improve production efficiency, save costs and shorten construction periods. Play an important role. [0003] In the process of using BIM technology to simulate the layout...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B66C13/18B66C13/16B66C23/62
CPCB66C13/16B66C13/18B66C23/62
Inventor 蔡大伟沈鹏方涛丁奇杰周宏王小园王恒兴顾介椿
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD