A processing technology for grouting system for wharf and bridge piling steel pipes
A technology of grouting system and processing technology, which is applied in the direction of sheet pile wall, foundation structure engineering, construction, etc. It can solve the problems of soil blockage around the grout hole, influence of steel pipe installation cycle, and inability to inject concrete, etc., so as to ensure a stable connection degree, guaranteed grouting efficiency, grouting effect, and reduction in material requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The invention is like Figure 1-9 As shown, the bottom of the steel pipe 1 is provided with at least one group of slurry holes located in the same axial section, and the group of slurry holes is composed of at least one slurry hole 10 located on different cross sections of the steel pipe 1; (Figure) The middle is convenient for illustration, there are six groups of pulp holes, each group of pulp holes has two holes)
[0038] The grouting system includes at least one grouting pipe group corresponding to the grouting hole group 2, at least one inner guard plate 3 corresponding to the grouting pipe group 2 one-to-one, and at least one corresponding to the grouting hole 10 one-to-one The outer guard plate 4, the grouting pipe group 2 is composed of grouting pipes 20 corresponding to and communicating with the outlet holes 10 in the same outlet hole group, and the grouting pipe 20 is attached to the steel pipe 1 On the inner wall and the top end extends above the steel pipe 1;...