The utility model relates to the technical field, in particular to an overwater
pile foundation construction platform. A water
pile foundation construction platform comprises a
cofferdam arranged on a riverbed, a plurality of steel casings are arranged in the
cofferdam, the steel casings are perpendicular to the riverbed, and one end of each steel casing is inserted into the riverbed; the lower-layer platform is fixedly arranged in the
cofferdam, the lower-layer platform and the other end of the steel casing are located at the same height, a
slurry circulating device is arranged on the lower-layer platform, and the
slurry circulating device is connected with the steel casing; the upper-layer platform is arranged above the lower-layer platform through steel
pipe piles, a drilling device is arranged on the upper-layer platform, and a
drill bit of the drilling device extends into any steel casing. The height of the steel casing is consistent with that of the lower-layer platform, the
pressure difference between
slurry and water in the steel casing can be guaranteed, and the problems that the slurry breaks through the steel casing and is mixed with
river water, the slurry proportion is changed, and drilling
slag cannot be lifted through the slurry are solved.