Method for determining alternating injection time of polymer flooding
A method of determination and alternate injection technology, which is applied in earth-moving drilling, production of fluids, wellbore/well components, etc., which can solve the problem that the timing of alternate injection has not been reported in the literature.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The experimental methods used in the following examples are conventional methods unless otherwise specified.
[0026] The materials and reagents used in the following examples can be obtained from commercial sources unless otherwise specified.
[0027] The variation of the slug split rate with the injection volume of a single polymer concentration is as follows: figure 1 As shown, before polymer flooding, water flooding is carried out first, and when the water content in the produced fluid reaches 40-100%, polymer flooding is performed by injecting polymer aqueous solution, and the timing of injection is alternate timing 1; The diversion rate of the aqueous polymer solution in the hypertonic layer is in a V-shape that first falls and then rises. The timing corresponding to the turning point of the decline and rise is the alternation timing 2. At the alternation timing 2, the polymer aqueous solution with a lower viscosity than before is injected ; The diversion rate of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com