[0061] Example 1: Arrange auger drills along the trough on the first mining face. For safe drilling, the inclination length of the first mining face is generally required to be less than 120m; on the working face, a drill is arranged along the trough to drill 40m into the working face. The drilling rig arranged along the groove under the surface drills 80m into the working face on the one hand, and drills no less than 40m to the next working face on the other hand. The distance between the drill holes is 2~3m, as attached figure 1 Shown.
[0062] Different from the traditional auger for mining thin coal seams, the present invention is aimed at high gas coal seams. The auger coal mining machine is used to drill ultra-thin coal seams of about 0.3m in order to form high gas coal seams. The concentric holes are filled with high water filling equipment around the auger and filled in time.
[0063] Due to the opening of the hole, the stress concentration around the drilling hole is cause...