A Method for Determining the Pore Formation of Cut-off Wall on Steep Bedrock Surface Under Deep Overburden
A technology of deep covering layer and bedrock surface, which is applied in the direction of sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of difficult foundation-cover interface judgment, difficulty in forming grooves, slip drilling in groove section construction, etc., to improve wall Body stability, simple construction, and reduced construction difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention will be further described with a specific embodiment below in conjunction with the accompanying drawings.
[0034] The anti-seepage wall construction is carried out in the SF35 slot section of the dam cofferdam of the Wudongde Hydropower Station on the Jinsha River. The depth of the slot is 63.3-68.9m, and the inclination angle of the foundation-cover interface is about 60°. The overburden part in the groove section adopts conventional percussion drilling technology and wall protection method, and drills to the vicinity of the presumed foundation-covering interface. The drill bit diameter of the percussion drill is φ1.2m, such as figure 1 As shown; after the drilling of the overburden layer 3 is completed, the pilot hole is used to drill with a small diameter of φ110mm, and the method of "two-end control and interpolation correction" is used to determine the interface shape of the base-cover. First construct the pilot holes in the slots 4 at both e...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 