Data processing method and device for economic dispatch of wind power plant
A data processing device and economic scheduling technology, applied in data processing applications, instruments, forecasting, etc., can solve problems such as poor convergence accuracy of intelligent optimization algorithms, long running time, and inability to truly reflect wind power output.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0150] Please refer to below figure 2 , the present invention also provides a data processing device for economic dispatch of wind farms. The first embodiment includes:
[0151] The first obtaining unit 201 is used to obtain the number of thermal power units participating in economic dispatch, the dispatch period, the predicted load of each time period in the dispatch period, the rotating reserve load of each time period in the dispatch period, and the embargoed area of the thermal power unit itself;
[0152] The first construction unit 202 is used for constructing the actual operation constraints by the number of thermal power units participating in economic dispatch, the dispatch period, the predicted load of each time period in the dispatch period, the rotating reserve load of each time period in the dispatch period, and the embargo domain of the thermal power unit itself. condition;
[0153] The second obtaining unit 203 is used to obtain the parameters of each thermal...
no. 4 example
[0186] Please refer to below Figure 5 , the present invention also provides a data processing device for economic dispatch of wind farms. The fourth embodiment includes:
[0187] The first obtaining unit 501 is used to obtain the number of thermal power units participating in economic dispatch, the dispatch period, the predicted load of each time period in the dispatch period, the rotating reserve load of each time period in the dispatch period, and the embargoed area of the thermal power unit itself;
[0188] The first construction unit 502 is used for constructing the actual operation constraint by the number of thermal power units participating in economic dispatch, the dispatch period, the predicted load of each period in the dispatch period, the rotating reserve load of each period in the dispatch period, and the embargo domain of the thermal power unit itself. condition;
[0189] The second obtaining unit 503 is used to obtain the parameters of each thermal power uni...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com