A large-diameter continuous ball catcher at the wellhead and its control method
A large-diameter, pressure-holding ball technology, used in earth-moving drilling, wellbore/well components, production fluids, etc. The number of catching balls and other issues can meet the requirements of safe production, efficiently recover pressure balls, and improve the efficiency of catching balls.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] In order to overcome the shortcomings in the existing ball catcher and its use method, this embodiment provides a method such as figure 1 The shown wellhead large diameter continuous ball catcher includes a cylindrical pipe section 1. The right side of the pipe section 1 is connected to the wellhead pipeline 2. The pipe section 1 is inclined 10°-15° downward along the vertical direction of the wellhead pipeline 2. The pipe section 1 is provided with a safety cock 3, an isolation cock 6 and a ball collecting cock 8 in sequence from right to left. The pipe section 1 between the safety cock 3 and the isolation cock 6 is provided with a screen 4, The surface of the screen 4 is provided with a plurality of flow holes 5, the left side of the ball collecting cock 8 is connected to a discharge pipeline 9, and the pipe section 1 in the middle of the screen 4 is connected to a discharge pipeline 11.
[0035] Wherein, the inner diameter of the sieve tube 4 is 85-90 mm.
[0036] In the...
Embodiment 2
[0041] On the basis of embodiment 1, the pipe section 1 between the isolation cock 6 and the ball-reducing cock 8 is provided with a spring sheet 7, which is mainly used to prevent the pressure ball passing through the isolation cock 6 from returning Drain backflow greatly improves the success rate of catching the ball. At the same time, the spring plate 7 is arranged on the left downstream of the isolation cock 6, which can be protected by the isolation cock 6 on the upstream of the right side. Intermittent shocks can prolong the service life and reduce the production cost. .
[0042] For the stability and sealing between the screen 4 and the pipe section 1, the screen 4 and the pipe section 1 are sealed and fixed by a sealing ring 10.
[0043] The flow hole 5 is diamond-shaped, the distance between the parallel sides of the flow hole 5 is 20-23mm, the acute angle of the rhombus side is 40-45°, and the flow hole 5 is along the axial and circumferential directions of the screen 4 ...
Embodiment 3
[0045] On the basis of Embodiment 1 and Embodiment 2, this embodiment provides a method for controlling a wellhead continuous ball catcher with a large diameter, which includes the following steps:
[0046] 1) Keep the safety cock 3, the isolation cock 6 and the ball collecting cock 8 in a closed state, and connect the wellhead pipeline 2 and the Christmas tree 13 through the upper flange 12 in the vertical direction.
[0047] 2) Open the blow-off process of the gas tree 13, open the safety cock 3, and start the flowback of the pressure ball and the flowback fluid in the well.
[0048] 3) After 15 minutes of venting, open the isolation cock 6 for 5 seconds, and close the isolation cock 6 again.
[0049] 4) Open the ball collecting cock 8 and recover the pressure ball discharged back and forth at the discharge line 9.
[0050] 5) Repeat step 3) and step 4) until all the squeezed balls in the well are recovered.
[0051] In the present invention, the wellhead pipeline 2 and the Christmas t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
