[0034] The implementation of the present invention will be described in detail below in conjunction with the accompanying drawings, but they do not constitute a limitation to the present invention, they are only examples, and at the same time, the advantages of the present invention will become clearer and easier to understand.
[0035] Technical research has been carried out on the main canal of the first phase of the middle line of the South-to-North Water Diversion Project. The project adopts a trapezoidal section, and the thickness of the full-section cast-in-place concrete lining slab is 8cm-10cm. The lower part of the lining slab is anti-seepage with a composite geomembrane. Concealed pipes (water-permeable hoses), check valves, etc. are representative of long-distance water delivery channels.
[0036] The channel lining of the present invention is repaired under the condition of uninterrupted water delivery, and the cofferdam semi-coffered foundation pit is characterized...