A workload statistics system and method for nuclear power design projects
A design project and statistical system technology, applied in the field of nuclear power design project workload statistics system, can solve the problems of unsystematic management of nuclear power design project workload, inaccurate data, etc., so as to facilitate tracking and analysis of related operations, system stability and high efficiency management effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] The embodiment of the present invention provides a nuclear power design project workload statistics system, see figure 1 , the system consists of:
[0057] The record card making module 101 is used to make the individual man-hour record card of each designer and the finished product man-hour record card, and generate man-hour metadata;
[0058] In this embodiment, on a monthly basis, the monthly individual man-hour record card and the designed finished man-hour record card are made by a special person, and the personal man-hour record card and the designed finished man-hour record card are collected by the administrator and imported into the system.
[0059] The data management system 102 is connected to the recording card making module 101, and is used to combine, constrain and verify the working hours metadata, generate valid working hours data, correct data differences and solidify the standard workload, and record the operation process;
[0060] The statistical ana...
Embodiment 2
[0085] The embodiment of the present invention provides a method for counting the workload of nuclear power design projects, which is applicable to the workload statistics system for nuclear power design projects shown in Embodiment 1, see Figure 4 , the method includes:
[0086] S1. Make the personal time record card of each designer and the finished product work time record card, and generate the man-hour metadata;
[0087] S2. Analyzing and processing the man-hour metadata, generating valid man-hour data, correcting data discrepancies and solidifying the standard workload, and recording the operation process;
[0088] S3. According to the effective working hours data, carry out cross-combination query of personal working hours and designed finished product working hours record cards, statistical analysis of data items, generate content management system integration information, and transmit the solidified standard workload to the database management center 108, and at the ...