Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Integrated management system for construction engineering

A comprehensive management and engineering technology, applied in the field of construction engineering comprehensive management system, can solve the problems of lack of management ability of managers, extensive management of migrant workers management, lack of information means of project management, etc., and achieve the effect of improving information scheduling

Inactive Publication Date: 2017-03-22
GUANGXI UNIV
View PDF4 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, it is of great significance and imminent for construction companies to strengthen the fine management of migrant workers. However, in the past, many project managements were not standardized enough, managers lacked professional management capabilities, and project management lacked effective informatization methods. The management of migrant workers was under extensive management.
Once safety and stability problems occur in the management of migrant workers, it is easy to cause large social conflicts, the consequences are very serious, and it will have a bad impact on the social image of the construction company and the development of the company

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated management system for construction engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0018] see figure 1 , a comprehensive management system for construction engineering, including a comprehensive processor for core data processing operations, a power supply for transmitting electric energy to the entire system, a memory for comprehensive data storage, a site management module for site coordination and management, and A project management module used for engineering project scheduling control; the integrated processor is respectively connected...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction engineering integrated management system. The system comprises an integrated processor which is used for core data processing operation, a power supply which is used for transmitting power to the whole system, a memory which is used for storing integrated data, an on-site management module which is used for on-site coordination management of a construction site, and a project management module which is used for engineering project schedule control. The integrated processor is connected with the power supply, the on-site management module, the data transmission module, the memory and the project management module. According to the invention, the construction engineering integrated management system integrates attendance management, GPS positioning, on-site management and other functions into a whole body, which is advantageous for centralized or separate management of construction site admission personnel in large-scale engineering construction; each admission person can be timely notified in case of an emergency; and the information scheduling of the entire project is greatly improved.

Description

technical field [0001] The invention relates to an electric vehicle circuit, in particular to a construction project comprehensive management system. Background technique [0002] In recent years, with the development of the economy, the pace of domestic infrastructure construction has also been greatly accelerated. However, due to the current management of construction contractors, labor service companies, and migrant workers is too simple and lacks an effective supervision and management system, the management of migrant workers' daily work, work conditions, and wage payment is relatively weak, which has caused some dissatisfaction. Necessary social disputes. [0003] At present, there are many problems in the management of construction personnel, and the management is extensive, which is manifested in the following aspects: migrant workers are highly mobile, and many construction projects are implemented in the form of professional subcontracting. The project content is ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08G07C1/10
CPCG06Q10/103G06Q50/08G07C1/10
Inventor 郭子民
Owner GUANGXI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products