A section optimization method for pipe jacking tunnel
An optimization method and tunnel technology, applied in tunnels, earthwork drilling, mining equipment, etc., can solve problems such as unfavorable jacking operations and increased jacking resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments, and the content of the present invention is not limited to the following embodiments.
[0029] see figure 1 , the pipe jacking tunnel section optimization method provided by the present invention comprises the following steps:
[0030] (1) Pre-excavation: Use a pipe jacking machine with a combined cutter head for tunnel excavation. The combined cutter head includes a main cutter head and an auxiliary cutter head. After the set distance is set, the operation is stopped, so that the pre-excavated tunnel is naturally deformed and the vault sinks. , the pre-excavation distance is 7 to 11 times the diameter of the tunnel;
[0031] (2) Monitor the sinking value of the vault: measure the section of the tunnel within 1 to 3 days after the completion of the tunnel excavation, and select the middle part of the excavated tunnel as the measurement point to avoid t...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com