A trackless construction method for subway rigid catenary
A technology of rigid contact and construction method, applied in the direction of overhead lines, etc., can solve the problems of long construction period, large operation interference, low work efficiency, etc., to improve construction efficiency, solve the delay of construction period, save time and manpower.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] A kind of metro rigid catenary trackless construction method, such as figure 1 , 2 shown, including the following steps:
[0025] Step 1. Calculation of catenary suspension point 7
[0026] A. Determine the starting point. In the section with a turnout, select a position 4m away from the center of the turnout as the starting point, that is, the mileage of the starting point = the distance of the turnout - 4m; in the section without a turnout, select the anchor section joint The first point is the starting point, and the mileage of the starting point is the terminal mileage + span value obtained by direct measurement on the CAD drawing; B. Calculate the 7 mileage of each suspension point, and calculate the mileage of the next point through the span; that is The mileage of the next point = the mileage of the starting point + the span; if the anchor section is at the fork, use the Excel accumulation formula, that is, the mileage of the next suspension point 7 is equal to...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com