Intelligent construction measurement setting-out method based on BIM (Building Information Modeling)
A technology for construction measurement and measurement stakeout, which is applied to measurement devices, measuring instruments, active optical measurement devices, etc., can solve problems affecting the efficiency and accuracy of measurement stakeout, and achieve a high degree of intelligence that is conducive to the creation, reduction of labor costs Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0028] It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.
[0029] Reference figure 1 , figure 1 It is a schematic flow diagram of a preferred embodiment of the BIM-based intelligent construction measurement stakeout method of the present invention.
[0030] In this preferred embodiment, a BIM-based intelligent construction measurement stakeout method includes the following steps:
[0031] Step S10, create a BIM model according to the drawings, and copy the created BIM model to the BIM mobile terminal after format conversion, start the BIM-based intelligent stakeout software and create a measurement stakeout task;
[0032] Step S20: After the intelligent total station is in place at the measurement setting-out site, use the BIM mobile terminal to connect to the intelligent total station, set the measurement parameters through the BIM mobile terminal and control the intelligent ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap