Drilling Fluid Treatment Method for Blocks in High Salt Gypsum Formation
A treatment method and drilling fluid technology, applied in drilling compositions, chemical instruments and methods, earthwork drilling and production, etc., can solve problems such as drilling fluid pollution, drill stuck accidents, drilling fluid thickening, etc., and achieve easy maintenance and treatment , the effect of saving the total cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] The test well is located in Shenquan block, Turpan area, Xinjiang Uygur Autonomous Region. It belongs to the Jurassic structure of Shen 102 in Shenquan Oilfield, and the well type is a directional well. The actual drilling depth is 2613m (vertical depth 2582.16m).
[0054] This well is a two-cut directional well. Firstly, a Φ375mm drill bit was drilled to 505m, and a 273.1mm*J55 surface casing was lowered to a depth of 504.02m. The cementing cement was returned to the surface, and the cementing quality was qualified.
[0055] Then the second drilling was started, and the Φ216mm drill bit was drilled to a depth of 1944m to start directional drilling.
[0056] The Φ216mm drill bit was drilled to a well depth of 2613m, and the drilling was completed, and the 139.7mm*TP110T / N80 oil layer casing was lowered to a depth of 2611.19m. The cementing cement was returned to 800m, and the cementing quality was qualified.
[0057] The drilling period is 10.37 days, and the well cons...
Embodiment 2
[0072] The test well is located in Shengnan block, Turpan area, Xinjiang Uygur Autonomous Region, which belongs to the Jurassic structure of Shengnan 2 block, and the well type is directional well. The actual drilling depth is 2450m (vertical depth 2395.62m).
[0073] This well is a two-cut directional well. Firstly, a Φ375mm drill bit was drilled to 402m, and a 273.1mm surface casing was lowered to a depth of 401.67m. The cementing cement was returned to the surface, and the cementing quality was qualified.
[0074] Then the second drilling was started, and the Φ216mm drill bit was drilled to a depth of 1453m to start directional drilling.
[0075] The Φ216mm drill bit was drilled to a well depth of 2450m, and the drilling was completed, and the 139.7mm*TP110T / N80 oil layer casing was lowered to a depth of 2448.90m. The cementing cement was returned to 1200m, and the cementing quality was qualified.
[0076] The drilling period is 16.58 days, and the well construction period...
PUM
| Property | Measurement | Unit |
|---|---|---|
| density | aaaaa | aaaaa |
| density | aaaaa | aaaaa |
| density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com


