Optimization method of train multi-beat coordinated operation based on cross entropy algorithm
An optimization method, cross-entropy technology, applied in computing, instrumentation, data processing applications, etc., can solve problems such as regularity destruction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0091] see figure 1 , the optimization method of the cross-entropy algorithm-based train multi-beat cooperative operation of the present embodiment, comprising the following steps:
[0092] S1: Taking the minimization of the total travel time of each beat-unit train as the optimization goal, and taking the same time-interval operation of the same-beat unit trains as constraints, and the minimum and maximum running time interval limits of the same-beat unit trains, etc., to construct the optimization of the coordinated operation of multi-beat unit trains Model.
[0093] S2: Design as figure 2 The decoding shown is used to represent the train multi-temporal coordinated operation timetable scheme.
[0094] S3: Initialize the probability parameters used to generate the solution of the train multi-temporal coordinated operation timetable.
[0095] S4: Randomly generate GS scheme solutions based on the given probability parameter values, and optimize and determine GS train multi...
Embodiment 2
[0107] Consider a high-speed railway line L=(S, E) consisting of K stations and K-1 double-track sections, where S is the sequence of stations in the uplink direction, and E is the set of train running sections in the uplink direction. Since the trains in the up and down directions of the double-track line are usually arranged to run on different section lines and station lanes, only the train timetable optimization for the uplink direction of the line is considered. Assuming that it has been determined in the stage of formulating the train operation plan that W beat-unit trains need to be run in the uplink direction of the line, for the w-th running beat-unit train, the number of operating trains is 6 w , all trains have the same origin station r w ∈S and terminal s w ∈S, the same via station set S w ∈S and via interval set E w ∈E, all trains at station i∈S w The minimum stop time for In the interval (i,j)∈E w The startup additional time, pure running time and stop add...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com