A three-dimensional interval construction method for underground comprehensive pipe gallery warehouse body
A technology of integrated pipe gallery and construction method, which is applied to artificial islands, water conservancy projects, underwater structures, etc., and can solve the problems of waterproof performance of pipe gallery, structural durability, structural bearing capacity, long construction period, and integrated cast-in-place underground Problems such as the immature construction technology of the pipe gallery have achieved the effect of reducing cracks, speeding up construction, and controlling cracks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The present invention will be further described below in conjunction with accompanying drawing.
[0036] see figure 1 and image 3 , the three-dimensional interval construction method of the underground comprehensive pipe gallery warehouse body, including the design of separate warehouses, reserved pre-embedding of the joints of double warehouses, retention of deformation joints, concrete pouring and waterproof treatment of deformation joints, the details are as follows:
[0037] (1) Warehouse design:
[0038] The distance between sub-warehouses is generally 20-30m. Generally, a deformation joint is set at the junction of the two sections. The deformation joint of the pipe gallery structure should penetrate through the bottom plate, wall and roof to achieve the purpose of stress release and resist the uneven settlement of the foundation and the pipe gallery. Telescopic deformation ( figure 2 );
[0039] (2) Reserved and pre-embedded joints of double compartments: ...