Movable arch changing device of tunnel primary support clearance interfering section and arch changing method thereof
A technology for tunnels and mobile frames, applied in tunnels, tunnel linings, shaft equipment, etc., can solve problems such as collapse of arches, prominent safety hazards, dangers, etc., and achieve the effects of easy movement and replacement of arches, easy promotion and application, and high construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below in conjunction with specific examples, so that those skilled in the art can better understand and implement the present invention, but the examples cited are not intended to limit the present invention.
[0028] The tunnel construction section and structure are distributed as figure 1 with figure 2 As shown, the supporting structure adopts a composite lining, the primary support 9 contains a steel arch 10, the steel arch 10 includes an invert 7, and the secondary lining 11 is cast-in-place reinforced concrete. The tunnel construction adopts the existing three-step seven-step excavation method.
[0029] A mobile arch changing device for the initial support of the tunnel invading the restricted section, such as image 3 As shown, it includes an annular reaction frame 1 and two moving frames 12, and there are two moving frames 12, both of which extend along the direction of travel of the tunnel, such as Figure 4 As shown, t...