A method for changing the arch using a mobile arch changing device for the primary support section of the tunnel
A technology for tunnels and moving frames, applied in tunnels, tunnel linings, shaft equipment and other directions, can solve the problems of arch frame collapse, outstanding safety hazards, dangers, etc., and achieve the effect of easy moving and changing arches, easy popularization and application, and high construction efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below in conjunction with specific examples, so that those skilled in the art can better understand the present invention and implement it, but the given examples are not intended to limit the present invention.
[0028] The tunnel construction section and structural distribution are as follows: figure 1 and figure 2 As shown, the support structure adopts composite lining, the primary support 9 includes a steel arch 10, the steel arch 10 includes an inverted arch 7, and the secondary lining 11 is cast-in-situ molded reinforced concrete. The tunnel construction adopts the existing three-step seven-step excavation method.
[0029] A mobile arch changing device for the primary support invasion section of the tunnel, such as image 3 As shown, it includes an annular reaction force frame 1 and two moving frames 12, and the moving frames 12 are two and all extend and place along the traveling direction of the tunnel, as Fig...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


