Program scheduling method of data acquisition monitor
A technology of data acquisition and scheduling method, which is applied in the direction of program control design, multi-programming device, program startup/switching, etc., can solve the problems of the module not running, unable to respond in time, and the image verification module processing time is long, etc. To achieve the effect of improving operational safety and reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Such as figure 2 Shown is a schematic diagram of program module scheduling of the method of the present invention: the present invention uses a real-time kernel for program scheduling of the data acquisition monitor, and cooperates with the interrupt service program to realize unified scientific scheduling of each program module in the data acquisition monitor. When the real-time kernel is used to schedule program modules, each program module is no longer scheduled in a polling or sequential manner, but scientifically and rationally scheduled, so it can respond to the operating requirements of each program in real time, and can effectively improve Operational safety and reliability of data acquisition monitors.
[0023] Such as image 3 Shown is the method flowchart of the present invention: adopt real-time kernel to carry out the program scheduling of data acquisition monitor, specifically comprise the steps:
[0024] S1. Analyze the program modules of the data acqu...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


