Wooden floor heating pavement construction method with graphene heating film

A technology of ethylene heating film and construction method, which is applied in heating methods, household heating, lighting and heating equipment, etc., can solve the problems of slow heating speed of floor heating, complicated heat delivery pipelines, and affecting heating effect, etc. Strong thermal conductivity and heating effect

Inactive Publication Date: 2017-09-12
SHANDONG TRANSPORT VOCATIONAL COLLEGE
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the heating rate of floor heating is slow. It takes about 4 hours at the fastest to feel the temperature of the floor (using ceramic tiles), and it takes about 16-24 hours (using wooden floors) if it is slower.
Moreover, the use in the bathroom is limited. Because the heating pipes for floor heating are relatively complicated, waterproofing must be done before and after laying the floor heating coil. etc.), the room temperature is often not up to the heating standard, and it needs to be supplemented with a back basket (radiator) as an auxiliary
When the floor heating system has been in operation for 2-4 years, the floor heating pipes will generate scale, which requires professional equipment to clean, otherwise it will directly affect the heating effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Wooden floor heating pavement construction method with graphene heating film
  • Wooden floor heating pavement construction method with graphene heating film
  • Wooden floor heating pavement construction method with graphene heating film

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0014] Example 1 For tiles with graphene heating film, the base layer adopts cement mortar bonding layer. The volume ratio of cement sand should be about 1:5, and should be sprinkled and stirred evenly. The thickness of the bonding layer should be about 3cm. When laying 5mm reflective film , It is necessary to clean up the sundries on the cement floor in time. After the paving is completed, before laying the 5mm graphene heating film, the reflective film should also be inspected. When laying the 5mm graphene heating film, the sundries on the cement base should be removed so that the diameter of dust, particles or protrusions does not exceed 0.5 mm, to ensure that the cement base is dry and clean, so as to avoid affecting the heating efficiency of the graphene heating film. The length of the 5mm graphene heating film is 1.5m and the width is 1m. When laying, it is laid along the cement base in accordance with the width direction of graphene. Lay 5mm graphene heating film cont...

Embodiment 2

[0015] Example 2 When laying the solid wood composite floor with graphene heating film and laying the 5mm reflective film, it is necessary to clean up the sundries on the cement floor in time. After the paving is completed, before laying the 5mm graphene heating film, the reflective film should also be inspected. When laying the 5mm graphene heating film, the sundries on the cement base should be removed so that the diameter of dust, particles or protrusions does not exceed 0.5 mm, to ensure that the cement base is dry and clean, so as to avoid affecting the heating efficiency of the graphene heating film. The length of the 5mm graphene heating film is 2m and the width is 1.5m. When laying, it is laid along the cement base in accordance with the width direction of graphene. Lay 5mm graphene heating film continuously. In order to ensure the heating area of ​​graphene heating film and prevent gaps during laying, two adjacent graphene films are overlapped, and the overlapping pa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
lengthaaaaaaaaaa
widthaaaaaaaaaa
Login to View More

Abstract

The invention belongs to floor construction techniques of indoor decoration of the field of house construction engineering, and discloses a wooden floor heating pavement construction method with a graphene heating film. On the basis the characteristic that graphene is good in heat conduction, the heating speed of an indoor floor with the graphene heating film is greatly increased as compared with that of a floor heating system. According to the wooden floor heating pavement construction method with the graphene heating film, the heating principle is adopted and the characteristic that the graphene heating film is good in heat conduction and heating property is utilized, the defect that a floor is not uniformly heated as tubes are distributed at unequal intervals when the floor heating system is laid is avoided. The method comprises the following steps: I, placing and laying a reflection film; II, mounting the graphene heating film; III, testing temperature by using an infrared temperature detector; IV, laying a composite multi-layer real-wood floor; V, testing the temperature of a ground surface by using the infrared temperature detector.

Description

technical field [0001] The patent of the present invention belongs to the interior design direction ground construction technology in the field of house construction engineering, and it is a wooden floor floor heating pavement construction method using the heating principle of graphene heating film. Background technique [0002] Floor heating is a kind of heating equipment that we often choose in our daily life, but it is generally used in northern regions because of the problem of temperature differences. However, the heating rate of floor heating is slow. It takes about 4 hours at the fastest to feel the temperature of the floor (using ceramic tiles), and it takes about 16-24 hours (using wooden floors) if it is slower. Moreover, the use in the bathroom is limited. Because the heating pipes for floor heating are relatively complicated, waterproofing must be done before and after laying the floor heating coil. etc.), the room temperature is often not up to the heating stan...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04F15/04F24D13/02
CPCF24D13/024E04F15/04F24D2200/08E04F2290/023
Inventor 王丹辉肖璇崔磊
Owner SHANDONG TRANSPORT VOCATIONAL COLLEGE