Safety early warning system and method for maintenance of 1000kV extra-high voltage AC transformer station

A safety early warning system, UHV AC technology, applied to alarms, instruments, etc., can solve problems such as poor accuracy, high maintenance costs, and failure to meet the substation inspection and maintenance procedures, and achieve simple and practical operation, low maintenance costs, and digitalization and the effect of standardized management

Inactive Publication Date: 2017-11-21
STATE GRID ANHUI ULTRA HIGH VOLTAGE CO +2
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method can only realize the visual display of maintenance operations, and requires a large number of cameras to be arranged in advance. The image transmission data is large, the maintenance cost is high, and the digital management of the operation process cannot be realized.
[0004] Existing warning devices (sound and light warning devices), warning signs, or fences can only warn maintenance personnel, but cannot prevent maintenance personnel from accidentally entering live compartments and mistakenly boarding live equipment
However, the existing positioning equipment has poor accuracy, high cost, and no practical value. Therefore, there is currently no substation maintenance operation process management and personnel positioning system that meets actual needs.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Safety early warning system and method for maintenance of 1000kV extra-high voltage AC transformer station
  • Safety early warning system and method for maintenance of 1000kV extra-high voltage AC transformer station
  • Safety early warning system and method for maintenance of 1000kV extra-high voltage AC transformer station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, so as to define the protection scope of the present invention more clearly.

[0027] see figure 1 , the embodiment of the present invention includes:

[0028] A 1000kV UHV AC substation maintenance operation safety early warning system includes a CPU, a power supply module, a wireless communication module connected to the CPU, an alarm module, and a display module, and the power supply module is connected to the CPU, the wireless communication module, the alarm module, and the display module respectively.

[0029] The wireless communication module is used to collect the location information of maintenance workers and live equipment, and the information of electrical inspection results, and transmit the instructions sent by...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a safety early warning system and method for maintenance of a 1000kV extra-high voltage AC transformer station, comprising a CPU, a power supply module, a wireless communication module, an alarm module and a display module. The safety early warning method is as follows: based on a three-dimensional map of a transformer station, a virtual electronic fence is planned with live equipment as the center, and positioning chips are arranged on maintenance workers, live equipment and maintenance tools; and the relative positions between the maintenance workers and the virtual electronic fence during the maintenance operation and conditions of actual operation steps are shown in the safety early warning system, when the maintenance workers mistakenly enter the virtual electronic fence and the actual operation steps do not meet the standard operation procedures, the alarm is started at the operation site and the safety early warning system at the same time, and the standard operation procedures are power cutting, electricity testing, ground connection, indication board hanging and fencing in the work area in order. The method realizes the standardized management of the transformer station maintenance work flow.

Description

technical field [0001] The invention relates to the field of substation operation and maintenance, in particular to a 1000kV UHV AC substation maintenance operation safety early warning system and method. Background technique [0002] There are many types of substation equipment, and the structure is not fixed. Compared with the line, the maintenance operation environment is more complicated, and the maintenance operation process is more cumbersome. Mishandling live equipment) is likely to cause safety accidents, so the management of the maintenance process and personnel management should be standardized to ensure the safety of substation maintenance equipment and personnel. [0003] At present, the safety warning method of substation maintenance operation is mainly based on image acquisition and processing. A substation operation safety management and control system based on visual positioning and dynamic target capture technology is mainly composed of high-definition camer...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G08B19/00
CPCG08B19/00
Inventor 张海峰房贻广李宏国文志科邵瑰玮张鹏飞付晶蔡焕青王新建胡霁张斌曾云飞朱俊许尧王雄奇
Owner STATE GRID ANHUI ULTRA HIGH VOLTAGE CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products