An Intelligent Foldable Crane for Municipal Roads
A technology for municipal roads and cranes, applied in cranes, load hanging components, transportation and packaging, etc., can solve the problems of cable-pulling equipment, low intelligence, inability to effectively maintain the efficiency of equipment safety and municipal road construction, etc. The effect of the work environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] see Figure 1-Figure 10, the present invention provides an intelligent foldable crane for municipal roads. 7. Main arm 8, lifting and folding hydraulic cylinder 9, bolt 10, end wall connecting shaft 11, end wall 12, backing plate 13, driving turntable 14, telescopic square tube 15, hook 16, hydraulic cylinder fixing seat 17, the The bottom end of the actuator 2 is welded on the fixed base 1 without an integrated structure. The actuator 2 is hinged with the main arm 8 through the coupling rod 3. The internal mechanical connection of the main arm 8 is connected with the folding arm 7 and cooperates with each other. , the end wall connecting shaft 11 is mechanically connected to the end of the end wall 12 through the bolt 10, the end of the end wall 12 is hinged with the main arm 8 through the end wall connecting shaft 11, and the lifting and folding hydraulic cylinder 9 is installed on the main arm The lower end and one end of the arm 8 are movably connected with the end...
Embodiment 2
[0041] see Figure 1-Figure 11 , the folding arm 7 is provided with a nut 71, a screw 72, a support sleeve 73, a screw through hole 74, a piston rod 75, a gear 76, and a sealing ring 77, and the screw 72 is nested in the screw through hole 74 through the support sleeve 73 Inside, the nut 71 is provided with two and is loosely matched with the screw rod 72, the piston rod 75 is nested in the groove inside the folding arm 7, and the bottom end of the folding arm 7 is provided with a gear 76, the A sealing ring 77 is installed at the port of the gear 76 to cooperate with the boom strut 4 , and one end of the piston rod 75 close to the gear 76 is in clearance fit with the lifting and folding hydraulic cylinder 9 through the piston.
[0042] A piston rod 75 is arranged inside the folding arm 7. The piston rod 75 is a part of the hydraulic cylinder movement execution part, which can support the connecting part of the piston to do work. When the folding arm 7 realizes the folding wor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com