Unlock instant, AI-driven research and patent intelligence for your innovation.

Underground diaphragm wall and construction method thereof

A technology of underground diaphragm wall and construction method, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of building area and space usage impact, long removal time of obstacle piles, construction period impact, etc., so as to avoid high costs and delays in construction, ensuring construction quality, and increasing the effect of lateral stiffness

Pending Publication Date: 2017-12-22
THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] During the construction of the underground diaphragm wall in the foundation pit project, obstacle piles left over from the original site are often encountered. There are two conventional processing methods. One is to move the plane position of the underground diaphragm wall, which often affects the construction area. and space use. For some projects with high building area and space use requirements, another method is often used to remove the obstacle piles. The removal of the obstacle piles requires the use of large mechanical equipment, which costs a lot, and the obstacle piles It takes a long time to pull out, which will have a certain impact on the construction period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Underground diaphragm wall and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0024] Embodiment: An underground continuous wall, comprising an obstacle pile 4, and walls 3 located on both sides of the obstacle pile 4, the walls 3 on both sides of the obstacle pile 4 use the obstacle pile 4 as a joint, There are three high-pressure jet grouting piles 2 with a diameter of 800 mm at the joint position between the body 3 and the obstacle pile 4 and the outer side of the obstacle pile 4. The high-pressure jet grouting piles 2 are overlapped with each other, and the length of the overlap is 300 mm. H-shaped steel 1 is hung inside the high-pressure rotary grouting pile 2 on the outside of the pile as a supporting reinforcement. The specification of H-shaped steel 1 is 500×200×10×16.

[0025] The construction method of above-mentioned underground diaphragm wall, comprises the steps:

[0026] (1) Exploration of the basic situation of the obstacle pile: query the engineering data of the original site building, determine the data of the obstacle pile 4, excavate t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an underground diaphragm wall. The underground diaphragm wall comprises a barrier pile and wall bodies located on the two sides of the barrier pile. The barrier pile serves as a connector for the wall bodies on the two sides of the barrier pile. The connection positions of the wall bodies on the two sides and the barrier pile and the outer side of the barrier pile are provided with a plurality of high-pressure jet grouting piles. Supporting steel bars are arranged in the high-pressure jet grouting piles on the outer side of the barrier pile. The barrier pile during underground diaphragm wall construction serves as the connector, the plane position of the underground diaphragm wall does not need to be moved, the barrier pile does not need to be pulled out, and high cost and project delay caused by pile pulling are avoided under the situation that the building area and space usage are not influenced; and meanwhile, by means of the construction method, the waterproof performance and the protection performance of the underground diaphragm wall cannot be influenced, and the construction quality is ensured.

Description

technical field [0001] The invention relates to a deep foundation pit project of a construction project, in particular to a method for treating obstacle piles encountered in the construction of an underground continuous wall. Background technique [0002] With the continuous development of our country's economy and the process of urbanization, the land use in large and medium-sized cities is becoming increasingly tense. Old buildings are demolished and new buildings are constructed. encountered some unforeseen circumstances. [0003] During the construction of the underground diaphragm wall in the foundation pit project, obstacle piles left over from the original site are often encountered. There are two conventional processing methods. One is to move the plane position of the underground diaphragm wall, which often affects the construction area. and space use. For some projects with high building area and space use requirements, another method is often used to remove the o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/18E02D5/20
CPCE02D5/187E02D5/20
Inventor 殷帅杰李书信刘亚松李文明全有维张勇凌涛
Owner THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU