Inspection method of substation hard pressure plate based on three-level network
A three-level network and hard pressing board technology, which is applied in the direction of electrical components, circuit devices, information technology support systems, etc., can solve the problem of hard pressing board monitoring that cannot be switched on and off, the effective management of hard pressing boards in substations, and the inability to switch on and off hard pressing boards Judgment and other issues to achieve the effect of improving inspection work efficiency, ensuring reliability, and improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] Specific embodiments of the present invention will be described in detail below.
[0034] A three-level network-based inspection method for substation hard press plates, in which the hard press plate inspection system adopts a three-level network structure, such as figure 1 As shown, it is composed of monitoring host 1, data repeater 2, and inspection device 3. The internal communication of the system is realized by RS485 bus, and the communication protocol is MODBUS protocol. The monitoring host 1 is connected to several data repeaters 2 through the RS485 bus, and the data repeaters 2 are connected to several inspection devices 3 through the RS485 communication line. As the central monitoring layer of the three-level network, the monitoring host is mainly responsible for sending data commands to the data repeater, and receiving and analyzing the data uploaded by the data repeater, so as to judge whether the pressure plate is switched on or off. The data repeater is th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
