Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

79results about How to "Address effectiveness" patented technology

Business risk prediction system and method combined with multi-source data

The invention provides a business risk prediction system and method combined with multi-source data, and relates to the technical field of risk prediction, and the system comprises a data collection module which carries out the data collection, and generates a multi-source data set; the correlation analysis module is used for performing correlation analysis and generating a data correlation factor; the feature extraction module is used for extracting features and constructing a plurality of risk prediction sub-models; the prediction result output module is used for predicting and outputting a plurality of risk prediction results; and the risk prediction information acquisition module inputs the plurality of risk prediction results into the meta-learner for training, and acquires business risk prediction information. Through the method and the device, the technical problem that in the prior art, due to single data source, accuracy and comprehensiveness of an evaluation result are limited, and timely identification and effective response of an enterprise to a business risk are further influenced can be solved, prediction accuracy and reliability are improved, and more effective risk prediction information is provided for the business.
Owner:民信惠弘锋(深圳)投资合伙企业(有限合伙)

Multi-service QoS cross-band bandwidth allocation method and system based on deep reinforcement learning

The invention discloses a multi-service QoS cross-band bandwidth allocation method and system based on deep reinforcement learning, and relates to the technical field of wireless communication. Comprising the following steps: constructing an effective capacity model to define an overall optimization target of bandwidth resources; on the basis of the effective capacity model, a multi-task hierarchical architecture based on deep reinforcement learning is constructed, and the architecture preliminarily allocates total bandwidth resources of Sub-6GHz and millimeter wave frequency bands through a high-level network; fine allocation is carried out on specific bandwidth resources in each frequency band through a low-layer network; a shared presentation layer, a strategy head and a value head are introduced into a high-level network and a low-level network respectively, the shared presentation layer captures common features of different frequency bands, the strategy head generates a specific distribution strategy, and the value head evaluates the distribution effect. According to the method, global optimization and local optimization requirements in resource allocation are successfully balanced through combination of global and local strategies, and the method has outstanding performance in the aspects of reducing delay, improving SINR and improving user experience.
Owner:DALIAN UNIV

Carbon emission flow iterative calculation method and system of reference power transmission system, medium and processor

The invention provides a carbon emission flow iterative calculation method of a reference power transmission system. The method comprises the following steps: constructing a carbon emission factor and carbon intensity correlation model in each node in the reference power transmission system and a carbon emission factor correlation model between the nodes; converting the correlation model of the carbon emission factors among the nodes to obtain a linear equation of the carbon emission factors among the nodes; obtaining a carbon emission factor linear equation set according to the inter-node carbon emission factor linear equation set; converting the carbon emission factor linear equation set into a corresponding carbon emission factor matrix; decomposing the carbon emission factor matrix coefficient to obtain an iterative matrix of the Jacobi method; obtaining a carbon emission factor iteration equation matrix and a carbon emission factor iteration equation set according to the iteration matrix; and after iterative calculation convergence is performed on the carbon emission factor iterative equation set, the carbon intensity of each node is obtained in combination with the carbon emission factor and carbon intensity correlation model. A carbon emission flow theoretical model based on power flow is expanded, and the method has high adaptability.
Owner:GUANGXI POWER GRID CO LTD NANNING POWER SUPPLY BUREAU

Effective signal filtering and noise reduction method and system for tunnel water and mud inrush disaster micro-seismic event

The invention provides an effective signal filtering and noise reduction method and system for a micro-seismic event of a tunnel water and mud inrush disaster, and relates to the technical field of signal processing. Comprising the following steps: acquiring original signals of water-inrush and mud-inrush micro-seismic events; performing modal decomposition on the original signal by using a variational modal decomposition method to obtain a plurality of modal components; calculating a cross correlation coefficient between the original signal and each modal component; based on the center frequency of each modal component and in combination with the cross correlation coefficient, performing primary noise reduction on the plurality of modal components; performing de-trend fluctuation analysis on the modal components after the primary noise reduction screening to obtain scale indexes of the modal components after the primary noise reduction screening, and performing secondary noise reduction based on the scale indexes; and reconstructing the modal component after the secondary noise reduction screening to obtain a micro-seismic signal after noise reduction filtering. According to the method, the problem that noise and effective signals in part of modal components are mixed is solved, and the weak signal extraction capacity is improved.
Owner:SHANDONG UNIV +2

Soil heavy metal pollution repairing agent based on biomass power plant ash and preparation method thereof

The invention relates to the technical field of soil improvement materials, and provides a soil heavy metal pollution repairing agent based on biomass power plant ash, which mainly comprises surface modified porous biomass power plant ash, polymer modified bentonite, a soil modified repairing agent and clay minerals. The surface modified porous biomass power plant ash is obtained through gamma-aminopropyltriethoxysilane and humic acid modified porous biomass power plant ash clustering, and the polymer modified bentonite is bentonite modified by acrylic acid and sodium carboxymethyl cellulose through a polymerization reaction. The preparation method comprises the steps of pretreatment of biomass power plant ash, liquid nitrogen freezing, freeze drying, porous structure formation, surface modification and the like. The components are mixed, granulated and molded, so that the obtained remediation agent can effectively reduce the bio-availability of heavy metals in soil, reduce the heavy metal absorption of crops and improve the soil environment quality.
Owner:河南省地质研究院

Multi-mode redundant automatic driving vehicle model-free longitudinal control method

ActiveCN119568128ARealize vertical stability controlSolve the stability problem of vertical controlDrive by wireControl signal
The invention discloses a multi-mode redundant model-free longitudinal control method for an automatic driving vehicle. The method comprises the following steps: collecting a longitudinal control signal source; establishing an off-line driving torque database and an off-line braking pressure database; designing a model-free vehicle speed control strategy, and calculating a vehicle speed expected driving torque and a vehicle speed expected braking pressure; designing a model-free acceleration control strategy, and calculating an expected acceleration driving torque; a model-free deceleration control strategy is designed, and deceleration expected brake pressure is calculated; and according to the vehicle speed expected driving torque, the vehicle speed expected braking pressure, the acceleration expected driving torque and the deceleration expected braking pressure, a model-free longitudinal control mode arbitration strategy is designed, the request driving torque and the request braking pressure are output, and longitudinal operation is achieved. According to the method, the stability problem of longitudinal control of the automatic driving vehicle can be solved under the condition that vehicle model parameters are missing or the model parameters are uncertain, and unexpected driving or braking caused by interference of factors such as program abnormity and communication congestion is prevented.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Simulation method for opening and expanding of each cluster of perforation fracturing of multi-cluster flow-limiting method in evaluation section

The invention relates to the technical field of oil and gas well yield increase and transformation, in particular to a simulation method for opening and expanding of each cluster of perforation fracturing through a multi-cluster flow limiting method in an evaluation section. Establishing a multi-cluster fracture fracturing fluid distribution calculation model in the shaft; a multi-cluster crack initiation and expansion fluid-solid coupling model is established, and a Picard iteration method and an implicit pressure saturation method are used for coupling solution; calculating through a simulation program to obtain the hole number of each cluster and crack initiation extension characteristics so as to judge the hole number of each cluster and the crack opening condition of each cluster; according to the method, through simulation calculation, the problem that whether multiple clusters in the flow-limiting method perforation fracturing middle section are effectively opened and transformed or not is solved, technical guidance is provided for efficient exploration and development of compact oil and gas reservoirs, and meanwhile the practicability and stability of the flow-limiting method perforation fracturing well completion site construction diagnosis technology are improved.
Owner:DAQING OILFIELD CO LTD +1

Dissociable nano-particles based on curcumin iron coordination as well as preparation method and application of dissociable nano-particles

The invention discloses dissociable nanoparticles based on curcumin iron coordination and a preparation method and application thereof, and belongs to the technical field of photothermal conversion materials. The preparation method of the dissociable nano-particles based on curcumin iron coordination comprises the following steps: uniformly mixing soluble iron salt, polyethylene glycol grafted polyglutamic acid and water, then adding a curcumin ethanol solution, and then carrying out stirring, impurity removal, centrifugation and ultrasonic treatment to prepare the dissociable nano-particles based on curcumin iron coordination. An endogenous iron element, food-borne curcumin and polymers polyethylene glycol and polyglutamic acid approved by FDA are selected as raw materials, and the constructed curcumin iron coordination-based dissociable nanoparticles have an appropriate EPR effect, can be accumulated in a tumor area and can be used for efficient photo-thermal therapy. Moreover, after the treatment work is finished, dissociation can be carried out through a dynamic disassembly strategy triggered by deferoxamine mesylate, curcumin is released so as to realize photothermal therapy and chemotherapy combined therapy and realize rapid removal, so that potential long-term toxicity to main visceral organs is avoided.
Owner:JILIN TEACHERS INST OF ENG & TECH

Method and device for monitoring version updating safety of POS machine software

The invention discloses a POS machine software version update security monitoring method and device, and relates to the technical field of information security, and the method comprises the steps: obtaining a version update data packet; analyzing the data packet and obtaining an update function group; analyzing the security level of the update function group, and if the security level is greater than or equal to a preset security level, obtaining a first-level security monitoring instruction; performing deep correlation monitoring on the updated function group according to the instruction, and outputting a deep correlation monitoring data set; and performing security analysis based on the monitoring data set, outputting an associated risk index, and if the associated risk index is smaller than a preset value, performing update deployment on the POS terminal according to the update function group. The technical problem that potential safety risks in POS machine software version updating cannot be effectively monitored, prevented and controlled is solved, and the effect of comprehensive safety guarantee in the version updating process is achieved by monitoring the safety levels of the updating function groups in a graded mode and executing safety monitoring of the corresponding levels according to different safety requirements.
Owner:GUANGZHOU HELIBAO PAYMENT TECH CO LTD

Water-soluble fertilizer suitable for Xinjiang'dry sowing and wet emergence 'cotton field as well as preparation method and application of water-soluble fertilizer

The invention discloses a water-soluble fertilizer suitable for Xinjiang'dry sowing and wet emergence 'cotton fields as well as a preparation method and application of the water-soluble fertilizer. Belongs to the technical field of water-soluble fertilizers. The water-soluble fertilizer comprises the following components in parts by mass: 5-41 parts of urea, 21-60 parts of urea phosphate and 13-48 parts of potassium sulfate. Potassium sulfate is mixed with other raw materials in batches by using a three-dimensional mixer, and then mixed granulation is performed. Compared with the prior art, the method has the beneficial effects that the water-soluble fertilizer is dripped along with water by utilizing a drip irrigation facility of a'dry sowing and wet discharging 'cotton field; according to the water-soluble fertilizer formula and the dripping method, the emergence rate of the cotton can be increased, and the problems that the emergence rate is difficult, weak and stiff due to nutrient requirements of growth and development of the cotton in the seedling stage, adverse factors such as an external saline-alkali environment in the seedling stage, tender roots and insufficient photosynthetic ability, and the like, and the problems of seedling deficiency and insufficient group construction caused by the phenomena are solved.
Owner:新疆维吾尔自治区耕地质量监测保护中心(新疆维吾尔自治区农田建设质量评价中心) +1

Digital management system for valvular heart disease

The invention discloses a heart valvular disease digital management system, which relates to the technical field of medical data management, and is characterized in that a data acquisition module comprises an automatic acquisition unit and a multi-channel input unit; the storage management module comprises a data storage unit and a data management unit; the monitoring and early warning module comprises a data analysis unit and a health early warning unit; the data visualization module comprises a chart display unit, a dynamic interaction unit and a report generation unit; the health assistant module comprises a personalized management unit, a follow-up visit management unit, a health activity evaluation unit, an intelligent reasoning unit and a family member unit. The system has an early risk perception and hospital-family linkage valvular heart disease full-process digital health management mode, can improve the active health management ability of patients, controls disease risk factors, effectively restrains the risk of cardiovascular diseases, and improves the overall quality and efficiency of medical services.
Owner:蚌埠医科大学第一附属医院

New energy power generation equipment accurate monitoring and operation data analysis method

The invention relates to the technical field of power generation equipment data monitoring, in particular to a new energy power generation equipment accurate monitoring and operation data analysis method. Comprising the following steps: data acquisition and storage: deploying sensors at key nodes to acquire data; evaluating a running state, extracting key indexes such as equipment efficiency, energy consumption and environmental adaptability, and quantifying a scoring standard; an evaluation function is constructed, an analytic hierarchy process and an entropy weight method are combined to determine a weight, and a normalized weight value and a comprehensive evaluation value are calculated; carrying out anomaly detection and early warning, defining an early warning level based on the comprehensive evaluation value, and carrying out mean shift detection; early warning operation and emergency response are carried out, a feedback mechanism is established, and emergency measures under different early warning levels are formulated. According to the method, the equipment operation state monitoring accuracy, the data evaluation scientificity and the abnormity processing timeliness and effectiveness are improved, and stable operation and efficient power generation of the new energy power generation equipment are guaranteed.
Owner:GUANGDONG ENERGY GROUP GUIZHOU CO LTD CENTRAL CHINA BRANCH

Building air conditioner load prediction method based on LTSM and ARIMA

The invention provides a building air conditioner load prediction method based on LTSM and ARIMA. The building air conditioner load prediction method comprises the following steps of S1, performing data acquisition; s2, a step of carrying out data preprocessing; s3, a step of carrying out modal decomposition; s4, a step of carrying out ARIMA model result analysis; and S5, carrying out result verification. According to the method, the problem of effectiveness of public building air conditioner load prediction is solved, that is, load prediction of a current public building air conditioner system is mainly based on traditional building simulation software or a single-module artificial intelligence algorithm, and the load prediction has certain limitations more or less. And a composite model in which a primary prediction model is established by adopting a long-short-term memory network and then a primary prediction result is corrected through a differential autoregression moving flat residual prediction model can effectively solve related problems in air conditioner load prediction.
Owner:CHENGDU YITAI INTELLIGENT TECH CO LTD

Communication processing method and device, communication transmission system, equipment and medium

PendingCN119583471AAddress effectivenessMeet the needs of multi-frame transmissionTransmissionMessage queueCommunication interface
The invention provides a communication processing method and device, a communication transmission system, equipment and a medium, and the method comprises the steps: obtaining a first state machine and a second state machine, the first state machine being used for recording a first working state of a first transceiver; the second state machine is used for recording a second working state of the second transceiver; a first target interface is called to transmit data to the annular message queue, the first target interface is a target communication interface in at least one communication interface of the first transceiver and the annular message queue, and the first target interface is determined according to the first working state and / or the second working state; and based on at least one of the first working state, the second working state and the first target interface, controlling the first working state recorded by the first state machine to perform state switching, thereby solving the problem that a one-way pipeline lacks an effective feedback and confirmation mechanism for multi-frame transmission, and meeting the requirement of multi-frame transmission.
Owner:CHINA AUTOMOTIVE INNOVATION CORP

Model reasoning accelerator and intelligent visual perception terminal based on FPGA

The present invention provides a model reasoning accelerator and an intelligent visual perception terminal based on FPGA, and the model reasoning accelerator based on FPGA includes a convolution operation unit, a data conversion unit, a pooling operation unit, a translation operation unit, a random reorganization operation unit and a fully connected unit. The above technical solution provided by the present invention is based on the idea of ​​synergy between processing hardware and algorithm model, designs the intelligent computing processing unit architecture, and constructs a neural network model suitable for different hardware environments of above-ground and underground scenarios, with a higher level of automation and intelligence.
Owner:BEIJING TIANMA INTELLIGENT CONTROL TECHNOLOGY CO LTD +1

Smart health management methods and platforms based on data analysis

The present invention discloses a smart health management method and platform based on data analysis, which relates to the field of health management technology. The method includes: obtaining target health management expectations based on target historical health records of target users, clustering and screening predetermined physiological indicators, and obtaining target key physiological indicators; matching a first indicator set corresponding to a first expectation; analyzing a first real-time indicator parameter set through a first management channel in a health management model to obtain a first management analysis result; if the first expectation does not reach a first predetermined expectation threshold, issuing a first management instruction, calling a first management plan, and performing health management on the target user. The present invention solves the technical problem in the prior art that the accuracy and effectiveness of current health management methods are low due to the large amount of health monitoring data and individual differences, and achieves the technical effect of improving the accuracy and effectiveness of health management by extracting key physiological indicators for personalized monitoring and management.
Owner:SHANDONG SHANGZHENG INFORMATION TECH CO LTD

Tool for disassembling coaxial radio frequency connector

This application discloses a tooling for assembling and disassembling coaxial RF connectors, belonging to the field of satellite manufacturing auxiliary tooling. The tooling includes a force-transmitting component, which comprises a main body, a receiving portion, and a force-transmitting portion extending axially along the main body. The force-transmitting portion is connected to the main body through the receiving portion. At least one communicating cavity is formed within the receiving portion and the force-transmitting portion. Openings communicating with the accommodating cavity are provided on the sidewalls of both the force-transmitting portion and the receiving portion. The force-transmitting portion is used to clamp the satellite's coaxial RF connector, the receiving portion is used to receive the RF cable of the coaxial RF connector, and the main body is used to receive the force transmitted through a standard installation tool. This application solves the problem that it is impossible to apply effective and uniform torque to the coaxial RF connector using standard installation tools within a confined space.
Owner:ZHEJIANG GEELY HLDG GRP CO LTD +2

Intelligent terminal for various industrial Ethernet interfaces

The utility model discloses an intelligent terminal for various industrial Ethernet interfaces, and relates to the technical field of intelligent terminals. The intelligent terminal used for various industrial Ethernet interfaces comprises a cashier counter; the intelligent terminal comprises an intelligent terminal main body and a storage protection assembly, the storage protection assembly is used for storing and protecting the intelligent terminal main body, and the storage protection assembly comprises a mounting opening formed in the upper surface of a cashier counter; and cleaning the disinfection assembly. By arranging the storage protection assembly and the cleaning and disinfecting assembly, two synchronous motors can be started to drive a placement plate and the intelligent terminal main body to enter the storage box for storage, and dust on the surface of the intelligent terminal main body in the descending process can be automatically cleaned; and bacteria on the surface of the intelligent terminal main body stored in the storage box can be effectively sterilized, so that the defect that the intelligent terminal cannot be effectively sterilized and cleaned in the prior art is effectively overcome.
Owner:CHANGZHOU HONGLI WEIGHING EQUIP

Chip mounter modular control system and method in monitoring mode, medium and product

The invention discloses a chip mounter modular control system and method in a monitoring mode, a medium and a product, and relates to the technical field of automatic production equipment control, and the method comprises the step of dividing the chip mounter control system into a plurality of independent modules, such as a main control module, a sub-motion module and a sub-vision module. And the main control module generates a moving instruction to drive the sub-motion module to a preset position, and triggers the sub-visual module to photograph and obtain a chip image. The sub-vision module calculates the matching degree and the deviation degree of the chip and feeds back the matching degree and the deviation degree to the main control module and the sub-motion module in real time. And the main control module judges the qualification of the chip according to a preset condition, and sends an adjusting or stopping instruction to the sub-motion module. And the sub-motion module adjusts or stops motion according to the instruction and feeds back the motion state in real time. Through independent operation of the subsystems and real-time scheduling of the main control system, the flexibility and the response speed of the system are improved, and the accuracy and the high efficiency of user operation are ensured.
Owner:DALIAN JAFENG AUTOMATION CO LTD

Combined installation method for embedded parts of water turbine

The invention discloses a combined installation method for embedded parts of a water turbine, and relates to the technical field of hydroelectric power stations. The water turbine embedded part combined installation method comprises the following steps that S1, a pressure steel pipe is installed; s2, mounting and fixing the seat ring; s3, a volute is correspondingly installed between the seat ring and the pressure steel pipe; s4, the adjusters are installed, the pressure steel pipe and the adjusters are subjected to full welding, the adjusters and the volute are welded, and welding circular seams are reserved; s5, fixing of the seat ring is relieved, and welding closing is conducted on a welding circular seam at the connecting position of the adjuster and the volute; s6, after the installation elevation and the horizontal deviation of the seat ring are determined and fine adjustment is carried out, the ring seat is fixedly installed; and S7, outer cladding reinforced concrete is poured. According to the combined mounting method for the embedded parts of the water turbine, the problem that the residual stress of the folding seam is large and cannot be effectively released during mounting of the adjuster can be effectively solved, the connecting quality after mounting of the adjuster is guaranteed, and potential safety hazards caused by mounting of the adjuster in the operation process of a power station are eliminated.
Owner:HUANENG LANCANG RIVER HYDROPOWER CO LTD

Game user touch classification management method, system and equipment and medium

The invention relates to the technical field of game operation, in particular to a game user reach classification management method, system and device and a medium, and the method specifically comprises the following steps: obtaining user reach data of each business line, and carrying out traffic dyeing on the user reach data through a preset classification label to form a unified business reach classification standard system; based on the service reach classification standard system, performing association analysis on an abnormal reach event occurring in a reach process and mark information of each link of the reach process, and determining an abnormal reason and a disposal strategy of the abnormal reach event; an association rule mining algorithm is utilized to analyze the arrival relevance between different service lines, and the arrival strategy is optimized by identifying the possible repeated arrival condition and excessive disturbance condition. According to the method, the pertinence and effectiveness of touch are improved, the visualization and transparency of the whole touch process are also realized, and the game operation efficiency and the user experience are greatly improved.
Owner:GUANGZHOU YIHU NETWORK TECH CO LTD

Cross communication test method of flexible direct current valve control system

The invention discloses a cross communication test method for a flexible direct-current valve control system, which is applied to the flexible direct-current valve control system and comprises the following steps: responding to a starting instruction, and starting flexible direct-current valve control full-link test equipment by the flexible direct-current valve control system; if it is detected that the pulse distribution box is disconnected from one of the odd-numbered modules or the even-numbered modules, normal communication of the power module is maintained through a pair of cross communication optical fibers; if it is detected that uplink output optical fibers between the power module and the pulse distribution box are all disconnected, or downlink input optical fibers are all disconnected, the bypass exits the power module; if it is detected that the uplink output optical fibers of the odd modules, the downlink input optical fibers of the even modules and the second cross communication optical fibers are all disconnected, the bypass exits from the power module; and the flexible direct-current valve control system is locked and stopped. The technical problem that the accuracy and effectiveness of cross communication function design cannot be confirmed due to the lack of a cross communication test technology between adjacent power modules of the flexible direct-current valve control system in the prior art can be solved.
Owner:ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +1

A method and system for digitizing a preventive maintenance schedule

ActiveCN117474518BAddress effectiveness
The present application relates to a kind of preventive maintenance schedule digital method and system, comprising: equipment failure mode analysis is carried out, and based on the list of to be formulated maintenance strategy generated by analysis result;According to the list of to be formulated maintenance strategy, equipment maintenance strategy analysis is summarized, and equipment preventive maintenance schedule is formed;According to the generation equipment structured maintenance module;According to equipment preventive maintenance schedule and equipment structured maintenance module, generate maintenance work order;Receive maintenance personnel in the maintenance measurement value recorded after according to maintenance work order is completed overhaul;Based on maintenance measurement value, equipment preventive maintenance schedule is optimized.The present application is from failure mode analysis, maintenance schedule formulation, maintenance procedure structuring, maintenance execution mobilization, to the whole range of business activities such as maintenance schedule closed loop optimization is digitized reconstruction, thoroughly break through the business barrier and data island in preventive maintenance process, solve the problem that current preventive maintenance schedule effectiveness cannot be continuously improved.
Owner:SUZHOU NUCLEAR POWER RES INST CO LTD

Preparation method of columnar model ice with controllable porosity and pore diameter

The invention provides a method for preparing columnar model ice with controllable porosity and pore diameter, which comprises the following steps: providing an ice making mold which comprises a side plate and a bottom plate which define a containing cavity, arranging and fixing at least one gas injection pipe on the bottom plate, and arranging a plurality of gas injection holes facing the containing cavity on the gas injection pipe, the air inlet end of the air injection pipe communicates with the air pump through the adjusting valve. The end, away from the air inlet end, of the air injection pipe is closed. Water is injected into the containing cavity, the ice making mold, the air pump, the adjusting valve and the air injection pipe are placed in a low-temperature environment to be cooled, and an initial freezing ice cover is formed on the upper surface of the water body and continues to be frozen downwards; after the initial frozen ice cover is formed, starting an air pump, and controlling the pressure of an air injection inlet and the air injection amount through a regulating valve, so that air enters the water body towards the accommodating cavity through an air injection hole; continuously injecting gas in the continuous freezing process of the water body, and adjusting the pressure of a gas injection inlet and the gas injection amount according to the freezing process until the model ice reaches the preset thickness; and demolding the model ice to obtain a model ice sample with columnar pores.
Owner:TIANJIN UNIV

Pedal device of electric standing bed for muscular tension traction and electric standing bed

PendingCN121943605AReal recovery stimulationEffective Rehabilitation StimulationChiropractic devicesRotational axisFoot boards
The invention relates to the technical field of medical rehabilitation equipment, in particular to a pedal device of an electric standing bed for muscular tension traction and the electric standing bed. Comprising a pedal angle adjusting unit, a first pedal, a second pedal, a pressure detecting unit and a controller. The pedal angle adjusting unit is arranged on the bed body and used for independently adjusting the angles of the first pedal and the second pedal with the coronal axis as a first rotating shaft and independently adjusting the angles of the first pedal and the second pedal with the sagittal axis as a second rotating shaft. The first pedal is positioned at the bed tail and is connected with the pedal angle adjusting unit; the second pedal is located at the bed tail and connected with the pedal angle adjusting unit, and the first pedal and the second pedal are arranged side by side in the width direction of the bed body; the pressure detection unit is arranged on the first pedal and the second pedal, covers the pedal surfaces of the first pedal and the second pedal, and is used for detecting pressure data applied to the pressure detection unit by the feet of the patient.
Owner:THE SECOND AFFILIATED HOSPITAL OF ANHUI UNIVERSITY OF TRADITIONAL CHINESE MEDICINE (ACUPUNCTURE AND MOXIBUSTION HOSPITAL OF ANHUI PROVINCE)

A power transmission line mutual inductance synchronous sampling intelligent filtering monitoring method and system

PendingCN122592089Aprecise alignmentprecise resection
The application discloses a kind of transmission line mutual inductance synchronous sampling intelligent filter monitoring method and system, it is related to transmission line state monitoring technical field, the application is by synchronous acquisition line three-phase voltage and current and mutual inductor temperature gradient and leakage flux density, into heat magnetic coupling transfer function generation phase shift distribution sequence, and accordingly execute fractional order delay interpolation resampling generation phase correction matrix;It is reconstructed into phase space evolution trajectory by delay coordinate mapping, according to node neighborhood manifold curvature cut-off random wideband noise, retain core attractor manifold;And it is converted into topological relationship diagram, calculates geodesic distance and state transition probability distribution connected edge weight, executes graph Laplace smoothing processing and generates synchronous measurement electric signal after reverse projection;Extract transient distortion feature vector and calculate its and historical benchmark set Mahalanobis distance generation electrical state deviation degree, when electrical state deviation degree is out of limit, generate abnormal early warning instruction, guarantee the accuracy of micro-fault monitoring.
Owner:이너 몽골리아 일렉트릭 파워 그룹 컴퍼니 리미티드 이너 몽골리아 일렉트릭 파워 리서치 인스티튜트 브랜치

A data sharing method and system based on a smart city

PendingCN122285764Asolve processing problemsSolve the problem of weak protectionData criteriaIntelligent city
This invention discloses a data sharing method and system based on smart cities, relating to the field of smart city data sharing technology. The method includes the following steps: S1, acquiring multi-source heterogeneous data from a smart city and establishing a unified data standardization rule base, wherein the data standardization rule base includes data format conversion, semantic mapping, and interface protocol adaptation rules; S2, based on the unified data standardization rule base, collecting, cleaning, format converting, and semantically mapping the multi-source heterogeneous data. This invention, by establishing a unified data standardization rule base, collects, cleans, converts, and semantically maps multi-source heterogeneous data from smart cities, such as transportation, environmental protection, government affairs, and energy, transforming it into standardized urban data and storing it on a unified data asset platform, effectively solving the problem of cross-domain data integration difficulties caused by inconsistent data standards in existing technologies.
Owner:CHANGZHOU DESHUI BUILDING DECORATION CO LTD

Closed oil recovery system of micro-positive pressure dirty oil system

The utility model relates to a closed oil recovery system of a micro-positive pressure sump oil system. The closed oil recovery system comprises an oil containing funnel, a buffer tank, a sump oil pump and an underground sump oil tank, the top of the buffer tank is connected with an oil containing funnel through a pipeline, a control valve is arranged on the pipeline connecting the buffer tank and the oil containing funnel, the bottom of the buffer tank is connected with a tank bottom valve through a pipeline, and the pipeline at the bottom of the buffer tank is connected with a dirty oil pipeline connected to an underground dirty oil tank through a connector. A balance line is arranged on one side of the buffer tank, and a regulating valve is arranged on the balance line; the underground sump oil tank is led out of the ground through a pipeline and connected to a sump oil pump inlet, and a sump oil pump outlet pipeline is connected to the device tank area sump oil tank. The problem of safe, effective and centralized recovery and storage of residual oil after a sampling bottle is replaced when a petrochemical enterprise takes a liquid oil sample is solved; the large potential safety hazard that oil product static accumulation is easily caused when an iron drum is carried when an oil drum is used for storing oil and a large number of oil drums are stored in a production area is avoided, and centralized recovery and storage of oil products in the later period are facilitated.
Owner:DALIAN FUJIA DAHUA GASOLINEEUM CHEM

Speed reducer performance optimization method and system based on multi-source data analysis

PendingCN121876156AGuaranteed uptimePrecise control of node temperatureGear lubrication/coolingProcess engineeringReducer
The invention relates to a speed reducer performance optimization method and system based on multi-source data analysis, and relates to the technical field of performance optimization, and the method comprises the steps: obtaining the initial temperature of each part corresponding to a preset working node number on a speed reducer; determining a rated temperature range based on the working node number; comparing the initial temperature with a rated temperature range to screen unqualified temperatures and problem working node numbers; searching a corresponding cooling water pipe number based on the problem working node number; main water pipes corresponding to the cooling water pipe numbers are controlled to be opened for cooling. The worm gear has the effect of solving the problems that when the worm gear and the worm are meshed, large sliding friction exists, heat is likely to be generated, and long-time high-load operation cannot be achieved.
Owner:HANGZHOU YIDING TRANSMISSION MACHINERY

A method and system for extracting wafer defect detection signals

This invention relates to a method and system for extracting wafer defect detection signals, comprising the following steps: circuit gain calibration; system dark noise calibration; PMT gain curve calibration; adaptive scanning parameter calibration; and wafer defect detection signal extraction. This invention solves the problems of system noise suppression and effective signal extraction in wafer defect detection systems, thereby improving defect detection sensitivity.
Owner:SHANGHAI YOU RUIPU SEMICON EQUIP CO LTD