Lean production advanced planning and scheduling system and method

A lean production and production system technology, applied in manufacturing computing systems, computing, instruments, etc., can solve problems such as low accuracy of production planning, low planning feasibility, and plan changes, so as to achieve fine control of production and processing costs and timely improvement performance and accuracy, and the effect of distributing equipment load

Active Publication Date: 2018-03-06
CHINA TOBACCO SHANDONG IND
View PDF6 Cites 35 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, due to the difficulty in accurately predicting the supply of raw materials and auxiliary materials, the surplus capacity of equipment, and the situation of personnel, the accuracy of production scheduling is low
The main reason is that it is difficult to accurately predict the balance of soft and hard packages, and the balance of machines between production points and within production points, which leads to difficulties in plan changes, adjustments, management and control, and waste of production capacity
Therefore, the current application effect of APS in the industry is not ideal, and it is still mainly estimated by manual experience, with low accuracy and low planning feasibility, and the optimal allocation of resources cannot be achieved.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Lean production advanced planning and scheduling system and method
  • Lean production advanced planning and scheduling system and method
  • Lean production advanced planning and scheduling system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] The present invention will be further introduced below in conjunction with the accompanying drawings and specific embodiments.

[0049] The invention discloses an advanced planning and scheduling system for lean production, such as figure 1 As shown, it includes several functional modules such as intelligent acquisition module, intelligent simulation scheduling module, intelligent scheduling module, intelligent adaptation module and simulation module. Based on the factory model, it is automatically generated under the support of the processing model by modifying the scheduling parameters. Scheduling plan, so as to realize the automatic operation of the whole process of order decomposition and plan issuance; realize the reasonable allocation of production tasks, and greatly reduce the time-consuming of production scheduling.

[0050] Intelligent simulation scheduling module - the system adopts the strategy of "overall modeling, segmented scheduling, upstream pull, intera...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a lean production advanced planning and scheduling system and method. The lean production advanced planning and scheduling system comprises an intelligent acquisition module, anintelligent simulated scheduling module, an intelligent dispatching module, an intelligent adaption module and an analog simulation module. The beneficial effects are that fine control for the production and processing cost is achieved through optimized applications on the aspects such as product combination, brand switching and balanced production; high efficiency of a scheduling result is achieved; the timeliness and the accuracy of a production plan are improved, timely supply of production materials and the safety of material delivery are effectively coordinated; the equipment load is effectively allocated, and the workload of the planners is substantially reduced.

Description

technical field [0001] The invention relates to the technical field of lean production advanced planning and scheduling (APS) for cigarette enterprises, in particular to an lean production advanced planning and scheduling system and method. Background technique [0002] In the process of building the production execution system (MES) system in the tobacco industry, many enterprises have built advanced planning and scheduling (APS) modules for enterprise lean production. Based on certain constraints, they use scheduling algorithms to optimize resource allocation. Considering enterprise resources ﹝Materials and production capacity are the main factors﹝Under the constraints and the control of the production site and the rules of dispatching workers, plan feasible material demand plans and production planning schedules to achieve "just-in-time" production. [0003] However, due to the difficulty in accurately predicting the supply of raw materials and auxiliary materials, the su...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/04
CPCG06Q10/06312G06Q50/04Y02P90/30
Inventor 王文智李琳何心芹黄秀高阳王彬彬张莎莎王广超万云飞
Owner CHINA TOBACCO SHANDONG IND
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products