A municipal road and its construction method
A technology for municipal roads and roads, applied in the directions of roads, roads, road safety devices, etc., can solve the problem that roads are not able to meet this requirement, and achieve the effect of good water absorption and drainage, reasonable structure, and reduced maintenance cycle.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Example 1, see Figure 1-5 .
[0031] This embodiment provides a kind of municipal road, and the structure of this road is more reasonable, and the existence of isolation belt 14 can make the vehicles running on both sides of the road safer; The green plants planted inside can grow better, reduce the maintenance cycle, make the road more environmentally friendly and aesthetically pleasing, and more in line with the needs of modern society.
[0032] Such as figure 1 As shown, this municipal road comprises a surface course 11, a cushion course 12 and a soil base 13; the surface course 11 is located above the cushion course 12, and the cushion course 12 is located above the soil course 13; Belt 14, isolation belt 14 comprises the water pipe 15 that is vertically arranged, and water pipe 15 is the structure of opening at both ends, and water pipe 15 passes surface course 11 and cushion course 12 and inserts described soil base 13, and the top of water pipe 15 protrudes fr...
Embodiment 2
[0053] The present embodiment provides a municipal road construction method, comprising the following steps:
[0054] Clean up the road surface to form the soil base 13;
[0055] In the middle of the soil base 13, a plurality of water pipes 15 are inserted at intervals along the length direction; the cushion layer 12 is laid; the surface layer 11 is laid; the top end of the water pipe 15 protrudes from the surface layer 11;
[0056] Two rows of planting frames 16 are arranged at intervals in the road width direction, so that the water pipe 15 is located in the middle of the two rows of planting frames 16; each row of planting frames 16 extends along the length of the road; planting grooves 17 are formed inside the planting frame 16, and two rows A planting area 18 is formed between the planting frames 16;
[0057] Fill the soil in the planting area 18 and the planting groove 17 to bury the water pipe 15 .
[0058] The longitudinal section of the planting frame 16 is U-shaped...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


