GOOSE network-based method for optimizing low-frequency load reduction in enterprise isolated power system operation
A low-frequency load shedding and isolated network technology, applied in the direction of AC network circuit, AC network voltage adjustment, power network operating system integration, etc., can solve the problems of total shutdown of generator sets, user power failure, enterprise loss, etc., to ensure safety and stability effect of running, reducing recovery time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] The technical solutions of the present invention will be further described below through specific examples.
[0010] Such as figure 1 As shown, it is a configuration block diagram of the optimized low-frequency load shedding system based on the GOOSE network of the present invention for enterprise isolated network operation.
[0011] Two sections of 10kV bus run in parallel. Two generators running in parallel on the left side of the bus are respectively connected to the two sections of bus. The right side of the bus is a feeder. Some feeders supply power to nearby equipment, and some feeders extend to distant places to supply power to loads. This is a typical enterprise-owned power plant's isolated grid primary equipment configuration scheme.
[0012] For secondary equipment, configure low-frequency load shedding devices near the power busbar, configure line protection measurement and control devices on the lines, configure equipment protection measurement and control ...