Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for judging wiring correctness of electric energy meter under condition of no load

An electric energy meter and correctness technology, applied in the direction of electrical connection test, measurement of electricity, measurement of electric variables, etc., can solve the problem of inability to measure the wiring of electric energy meters, and achieve the effect of improving work efficiency

Inactive Publication Date: 2018-06-01
PINGDINGSHAN POWER SUPPLY ELECTRIC POWER OF HENAN
View PDF10 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In view of this, the present invention provides a method for judging the correctness of electric energy meter wiring under no-load conditions, which can solve the problem that the electric energy meter wiring cannot be measured under no-load conditions, and improve the work efficiency of on-site acceptance

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for judging wiring correctness of electric energy meter under condition of no load
  • Method for judging wiring correctness of electric energy meter under condition of no load

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0024] The method for judging the correctness of the electric energy meter wiring under no-load conditions includes the following steps:

[0025] S1: Put in the reactive power compensation capacitor bank, measure the secondary current of the electric energy meter, and the current size should meet the requirements of the regulations;

[0026] S2: Record the voltages of the three phases A, B, and C as Ua, Ub, and Uc, record the combination of line voltages when connected in sequence as Uab, Ucb, record the first-phase current as Ia, and record the second-phase current as is Ic;

[0027] S3: Use a volt-ampere phase meter to measure the voltage, current and phase between the voltage and current of the electric energy meter wiring in sequence, and record the corresponding data;

[0028] S4: Judging whether the wiring of the electric energy meter is correct according to the recorded data.

[0029] In the step S4, if the measured voltage and current data are normal, and the phase r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for judging the wiring correctness of an electric energy meter under the condition of no load, which belongs to the technical field of on-site inspection and acceptanceof electric energy metering devices. The method comprises the following steps: S1, switching on a reactive power compensation capacitor bank, and measuring the secondary current of an electric energymeter, wherein the magnitude of current should conform to the requirements of the regulation; S2, recording the voltages of the phases A, B and C as Ua, Ub and Uc respectively, recording the line voltage combinations under the condition of wiring along the phase sequence as Uab and Ucb, recording a first phase current as Ia, and recording a second phase current as Ic; S3, using a volt-ampere phase meter to measure the voltage and the current of the wiring of the electric energy meter and the phase between the voltage and the current in turn, and recording corresponding data; and S4, determining whether the wiring of the electric energy meter is correct according to the recorded data. The problem that the wiring of an electric energy meter cannot be measured under the condition of no loadcan be solved. The work efficiency of on-site acceptance can be improved.

Description

technical field [0001] The invention relates to the technical field of on-site detection and acceptance of electric energy metering devices, in particular to a method for judging the correctness of electric energy meter wiring under no-load conditions. Background technique [0002] The electric energy meter is an important measuring tool for electric energy measurement, and the measured electric quantity is relatively large. In order to ensure the accuracy and reliability of electric energy measurement, the electric energy meter must be connected correctly, otherwise great losses or errors may occur. The electric energy metering device is the "steelyard" of each link of power generation, power supply, and electricity consumption in the electric power industry. The accuracy of its measurement is directly related to energy saving and economic accounting, and directly involves the interests of the country and enterprises. There is only one correct wiring method for the energy m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/04G01R35/04
CPCG01R35/04G01R31/67
Inventor 周惠民乔璇赵睿侯帅段宏伟袁涛郭毅鹏王逸超
Owner PINGDINGSHAN POWER SUPPLY ELECTRIC POWER OF HENAN
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products