Method for reflecting long-span engineering project progress

A kind of engineering project and large-span technology, applied in the field of reflecting the progress of large-span engineering projects, can solve the problems of not being able to efficiently reflect the overall picture of the project and reduce the efficiency of engineers to obtain information, so as to achieve the controllability of economic costs and benefits, The effect of reducing modeling cost and improving modeling efficiency

Inactive Publication Date: 2018-07-24
中建五局第三建设有限公司
View PDF7 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Long-span projects often involve the progress management of multiple working faces. The traditional way to describe the image of the project is through text, drawings, photos and other means, and a lot of useful

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for reflecting long-span engineering project progress

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

[0020] Such as figure 1 As shown, a method to reflect the progress of long-span engineering projects includes the following steps:

[0021] a. Use BIM technology to establish a BIM three-dimensional model associated with the schedule; the BIM model units associated with the schedule are divided according to the construction floor or construction section, and the BIM model unit of the schedule is not larger than the construction section or construction floor, preventing The BIM model associated with the schedule completely covers the real 3D model.

[0022] b. Use drones to fly near the ground over the construction project to capture video images, and use space triangulation encryption software to calculate the captured video images to form a real-world 3D model with an error accuracy of no more than 5cm;

[0023] c. Set the real 3D model of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention provides a method for reflecting a long-span engineering project progress. The method comprises the steps of: employing a real scene modeling technology and a BIM technology to construct an actual progress scene and a planning progress scene, and performing model data superposition to reflect an engineering progress condition, improve the controllability of engineering economic cost and benefit and ensure the completion of the whole engineering according to a progress plan. The method for reflecting a long-span engineering project progress can be widely applied to management of industrial and civil construction bridge and water conservancy and hydropower domain engineering subject visual progress.

Description

technical field [0001] The invention relates to a method for reflecting the progress of a large-span engineering project. Background technique [0002] In the process of project progress management, construction personnel often need to dynamically grasp the progress information of each working face in the construction process. Long-span projects often involve the progress management of multiple working faces. The traditional way to describe the image of the project is through text, drawings, photos and other means, and a lot of useful information is stored in a large number of materials, which reduces the need for engineers to obtain information. The efficiency can not even reflect the whole picture of the project efficiently. Contents of the invention [0003] The invention solves the deficiencies of the prior art and provides a method for reflecting the progress of a long-span engineering project, which can display the dynamic actual image progress and virtual image pro...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08G06T17/05G06T19/20
CPCG06Q10/0631G06Q50/08G06T17/05G06T19/20
Inventor 何昌杰宁志强周润东吴智
Owner 中建五局第三建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products