A sprinkler maintenance device for lining concrete used in tunnel construction
A technology for tunnel construction and concrete is applied in the field of lining concrete sprinkler curing devices, which can solve problems such as unfavorable health of workers, aggravating workers' burdens, and sore arms of workers, and achieves easy maintenance, low maintenance and repair costs, and labor intensity. small effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] A lining concrete sprinkler maintenance device for tunnel construction, such as Figure 1-6 As shown, it includes a base 1, a first roller 2, a second roller 3, an arc friction plate 4, a screw 5, a first guide plate 6, a first guide rod 7, a first spring 8, a large fixed plate 9, a rotating Shaft 10, first gear 11, grip rod 12, tooth plate 13, block 14, second guide rod 15, second guide plate 16, second spring 17, concave plate 18, large sleeve 19, large bearing 20 , lifting rod 21, arc housing 22, hose 23, first valve 24, high pressure pump 25, water tank 26, water inlet pipe 27, second valve 28, small connecting shaft 29 and small connecting plate 30, first roller 2 and the second roller 3 are located under the base 1, the first roller 2 is located on the right side of the second roller 3, the second roller 3 is connected to the base 1, and the arc-shaped friction plate 4 is located on the right side of the second roller 3. The friction plate 4 is matched with the s...
Embodiment 2
[0030] A lining concrete sprinkler maintenance device for tunnel construction, such as Figure 1-6 As shown, it includes a base 1, a first roller 2, a second roller 3, an arc friction plate 4, a screw 5, a first guide plate 6, a first guide rod 7, a first spring 8, a large fixed plate 9, a rotating Shaft 10, first gear 11, grip rod 12, tooth plate 13, block 14, second guide rod 15, second guide plate 16, second spring 17, concave plate 18, large sleeve 19, large bearing 20 , lifting rod 21, arc housing 22, hose 23, first valve 24, high pressure pump 25, water tank 26, water inlet pipe 27, second valve 28, small connecting shaft 29 and small connecting plate 30, first roller 2 and the second roller 3 are located under the base 1, the first roller 2 is located on the right side of the second roller 3, the second roller 3 is connected to the base 1, and the arc-shaped friction plate 4 is located on the right side of the second roller 3. The friction plate 4 is matched with the s...
Embodiment 3
[0033] A lining concrete sprinkler maintenance device for tunnel construction, such as Figure 1-6 As shown, it includes a base 1, a first roller 2, a second roller 3, an arc friction plate 4, a screw 5, a first guide plate 6, a first guide rod 7, a first spring 8, a large fixed plate 9, a rotating Shaft 10, first gear 11, grip rod 12, tooth plate 13, block 14, second guide rod 15, second guide plate 16, second spring 17, concave plate 18, large sleeve 19, large bearing 20 , lifting rod 21, arc housing 22, hose 23, first valve 24, high pressure pump 25, water tank 26, water inlet pipe 27, second valve 28, small connecting shaft 29 and small connecting plate 30, first roller 2 and the second roller 3 are located under the base 1, the first roller 2 is located on the right side of the second roller 3, the second roller 3 is connected to the base 1, and the arc-shaped friction plate 4 is located on the right side of the second roller 3. The friction plate 4 is matched with the s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


