Integral pouring and quick building process of prefabricated shear wall

A prefabricated assembly and shear wall technology, applied in the direction of walls, buildings, building components, etc., can solve the problems of poor construction accuracy, low construction efficiency, large environmental pollution, etc., so as to reduce construction costs and material costs, and reduce on-site construction costs The effect of simple process and on-site construction operation

Active Publication Date: 2018-08-10
刘振华 +1
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, my country's construction is still mainly cast-in-place on construction sites, and there are problems such as low construction efficiency, large resource consumption, large construction noise, large environmental pollution, low professionalism of construction teams, poor construction accuracy, and high user complaint rate. There is a big gap in building construction technology
[0003] my country's prefabricated buildings have just started and are advancing rapidly. Many technical issues are still in the exploratory stage. Some theoretically solved problems cannot be achieved in actual construction, and there are many hidden dangers that affect structural safety.
In particular, the existing prefabricated shear wall construction adopts the method of prefabricating the entire shear wall body in the factory and assembling it on site. The integrity of the node connection is poor, the connection operation of the steel bar is troublesome, the reliability of the steel bar connection is low, and the bearing capacity is unreliable. There are many security risks

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral pouring and quick building process of prefabricated shear wall
  • Integral pouring and quick building process of prefabricated shear wall
  • Integral pouring and quick building process of prefabricated shear wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0051] Such as figure 1 and figure 2 As shown, this embodiment includes the following steps:

[0052] Step 1, prefabricated wall panel 5 and reinforcement frame 19, prefabricated reinforced concrete wall panel 5 in factory, and prefabricated reinforcement frame 19;

[0053] Step 2, hoisting wallboard 5 and reinforcing bar frame 19, hoisting two relatively arranged wallboards 5 at the position of the shear wall to be constructed, and hoisting the reinforcing bar frame 19 positioned between two wallboards 5. The hoisting sequence of the wall panels 5 and the reinforcement frame 19 is not limited, it may be that two relatively arranged wall panels 5 are hoisted first, and the wall panels 5 are fixed, and then the reinforcement frame 19 is hoisted between the two wall panels 5 ; Also can be hoisting steel frame 19 earlier, then hoisting wallboard 5 again.

[0054] Step 4, fixing the sealing plate 20, fixing the sealing plate 20 between the two wall panels 5, the sealing plate ...

Embodiment 2

[0073] This embodiment includes the following steps:

[0074] Step 1, factory production, including the following operations,

[0075] (1) The factory produces welded steel mesh for the countertop, and welds and fixes the tie-bar connectors on the steel mesh, pours fine stone concrete, maintains it, and completes the prefabrication of the single-piece wall panel. The wallboard is not only the surface structure of the permanent shear wall, but also replaces the formwork during the construction process.

[0076] For the interior wall panels with standard floor heights, they can also be produced according to the wall height such as 2,78 meters wide, and the fixed length is 9 meters or 6 meters; it can be cut into a single reinforced concrete sheet according to the actual size of the single wall.

[0077] For external wall panels, it is a reinforced concrete composite panel that combines the outer concrete of the shear wall, steel mesh, tie bar connectors, insulation layer, prote...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an integral pouring and quick building process of a prefabricated shear wall. The construction of the shear wall can be completed through precasting a steel reinforcement frameand a reinforced concrete wallboard, lifting the wallboard and the stele reinforcement frame on a building site, then closing a lateral opening of the wallboard and pouring concrete, wherein the wallboard is precast into a reinforced concrete structure in a factory, and not only can serve as a bearing carrier of the shear wall, but also can serve as a template of the shear wall; the template doesnot need to be dismantled after the concrete is poured; the construction cost and the material cost are vastly decreased; the construction efficiency of the shear wall is improved. The precast steelreinforcement frame is arranged between two wallboards to strengthen the shear wall; the procedures of site construction are further reduced; the operation of the site construction is simpler; the construction efficiency is higher. Moreover, the concrete is poured on the spot in a sandwich layer between the two wallboards; the integrity of the node of the shear wall and a bottom to-be-connected position is ensured, and the connection of the node is more stable, more reliable and safer.

Description

technical field [0001] The invention belongs to the field of construction, and in particular relates to a prefabricated assembly type shear wall pouring and rapid construction process. Background technique [0002] At present, my country's construction is still mainly cast-in-place on construction sites, and there are problems such as low construction efficiency, large resource consumption, large construction noise, large environmental pollution, low professionalism of construction teams, poor construction accuracy, and high user complaint rate. There is a big gap in building construction technology. [0003] my country's prefabricated buildings have just started and are advancing rapidly. Many technical issues are still in the exploratory stage. Some theoretically solved problems cannot be achieved in actual construction, and there are many hidden dangers that affect structural safety. In particular, the existing prefabricated shear wall construction adopts the method of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B2/86
CPCE04B2/86
Inventor 刘振华
Owner 刘振华