Construction method of simply-supported transfer beam steel-structure connecting bridge in existing curtain wall building
A technology for existing curtain walls and existing buildings, applied in the direction of building components, building structures, buildings, etc., can solve the problems that the installation cannot fully guarantee the structural safety, the internal structure is unpredictable, and the danger is high, so as to achieve good social benefits, The effect of shortening the construction period and quick construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0041] The construction method of the simply supported transfer beam steel structure connecting bridge of the existing curtain wall building provided by this embodiment includes the following steps:
[0042] (1) Analysis of existing building structure
[0043] Remove the wall and curtain wall of the existing building where the bridge needs to be installed and expose the existing building structure, find out the structural column that can be used as a support, and design a simple structure that can meet the steel structure bridge support according to the actual size and situation of the column. A transfer beam is used to tie the structural column.
[0044] (2) Installation of the existing framed corbel buried board
[0045] 1 Install the embedded slab on the frame column, and the embedded slab adopts chemical planting reinforcement. First, according to the design requirements, determine the position according to the spacing and edge distance of the drawings, and drill holes o...
Embodiment 2 application example
[0070] (1) Expansion project on the south side of Hall 3# of Qingdao International Convention and Exhibition Center Conference Center Project
[0071] Project Overview
[0072] The expansion project on the south side of Hall 3# of Qingdao International Convention and Exhibition Center Project is located at No. 9 Miaoling Road, Qingdao, with a construction area of 12,974㎡ and a hall area of 5,386㎡ on the first floor. In order to connect the roof of the building with the original building, a steel structure is required bridge.
[0073] Construction
[0074] A steel structure connecting bridge needs to be installed on the north side of the roof of this project. This process is used to set simply supported transfer beams and tie the frame columns of the original building. The steel structure connecting bridge is connected to the simply supported transfer beams. The installation process of this project is strictly in accordance with The construction method of this constructio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com