Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Fuel gas heating water heater with hot water appointment function

A technology for gas heating and water heaters, applied in water heaters, fluid heaters, lighting and heating equipment, etc., can solve the problems of wasting cold water, slow hot water production, and long waiting time, so as to reduce the waste of cold water and reduce Repeated operation, the effect of improving the comfort of the bath

Pending Publication Date: 2018-08-21
MACRO THERMAL ENERGY TECH
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, conventional gas-fired heating water heaters are limited by the combustion heat transfer structure. Depending on the structure, the heating time of bathing water takes 25s-50s or even longer, the hot water is slower, the waiting time is long, and the waste released during the waiting process is wasted. cold water

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fuel gas heating water heater with hot water appointment function
  • Fuel gas heating water heater with hot water appointment function
  • Fuel gas heating water heater with hot water appointment function

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] In the description of the present invention, it should be noted that for orientation words, such as the term "center", "horizontal", "longitudinal", "length", "width", "thickness", "upper", "lower" , "Front", "Back", "Left", "Right", "Vertical", "Horizontal", "Top", "Bottom", "Inner", "Outer", "Clockwise", "Counterclockwise " and other indication orientations and positional relationships are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, or in a specific orientation. The structure and operation should not be construed as limiting the specific protection scope of the present invention.

[0026] In addition, terms such as "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying rela...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a fuel gas heating water heater with a hot water appointment function. The fuel gas heating water heater comprises a controller, a heat supply loop and a bathing loop, whereinthe controller is used for controlling the heat supply loop and the bathing loop to work. The fuel gas heating water heater is characterized in that a batching circulating water pump, a water flow sensor, a bathing water-inlet temperature probe, a bathing water outlet temperature probe, a water storage tank and a cold water inlet tube are arranged on the bathing loop, wherein the controller controls the bathing circulating water pump to start according to a signal fed back by the bathing water inlet temperature probe and the bathing water outlet temperature probe, and controls the fuel has heating water heater to start bathing combustion according to the signal fed back by the water flow sensor; a timer and an operator are connected on the controller; an appointment button and an instant-heating button are arranged on the operator; and instant or everyday timed pre-heating for bathing water is realized through the appointment button and the instant-heating button, so that repeated operations are reduced, waiting time is reduced, and water consumption is reduced.

Description

technical field [0001] The invention relates to the technical field of fluid heaters, in particular to a gas heating water heater with a hot water reservation function. Background technique [0002] At present, conventional gas-fired heating water heaters are limited by the combustion heat transfer structure. Depending on the structure, the heating time of bathing water takes 25s-50s or even longer, the hot water is slower, the waiting time is long, and the waste released during the waiting process is wasted. cold water. Contents of the invention [0003] Aiming at the problems existing in the prior art, the object of the present invention is to provide a gas-fired heating water heater with a hot water reservation function. [0004] To achieve the above object, the present invention adopts the following technical solutions. [0005] A gas heating water heater with hot water reservation function, comprising: a controller, a heating circuit and a bathing circuit, the contr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F24H1/00F24H9/20
CPCF24H1/0027F24H1/0072F24H9/2035
Inventor 孙高汪为彪李涛艾穗江
Owner MACRO THERMAL ENERGY TECH
Features
  • Generate Ideas
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More