Method for building bridge crossing ladder of marine engine room

A technology for engine rooms and ships, which is applied to the field of building bridge ladders in ship engine rooms, can solve the problems of inconvenient boarding of construction personnel, inconvenient on-site 6S management, inconvenient evacuation of construction personnel, etc. The effect of improving the construction environment

Inactive Publication Date: 2018-09-25
CSSC HUANGPU WENCHONG SHIPBUILDING COMPANY
View PDF2 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The entire route for construction personnel to enter the engine room is tortuous, and it is very inconvenient for construction personnel to board the ship and wastes a lot of man-hours. It will be more difficult for construction personnel to enter the engine room when they are holding heavy equipment such as air ducts and welding machines. In the event of a safety accident in the engine room, the above-mentioned route makes it inconvenient for construction workers to evacuate and poses a safety hazard
In addition, during the construction in the engine room, the air pipes and gas lines in this area pass through the main deck, resulting in chaotic pipeline layout, which is not conducive to on-site 6S management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for building bridge crossing ladder of marine engine room
  • Method for building bridge crossing ladder of marine engine room
  • Method for building bridge crossing ladder of marine engine room

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0027] It should be understood that the terms "first", "second", etc. are used in the present invention to describe various information, but these information should not be limited to these terms, and these terms are only used to distinguish information of the same type from each other. For example, "first" information may also be referred to as "second" information without departing from the scope of the present invention, and similarly, "second" information may al...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for building a bridge crossing ladder of a marine engine room. The method comprises the following steps: forming a through room process hole in an outer board of the marine engine room; after the through room process hole is formed, hoisting a marine engine room total section, in which the through room process hole is formed, into a dock, so as to finish carrying; and building the bridge crossing ladder between the through room process hole and a dock wall gallery. By utilizing the method provided by the technical scheme of the invention, the layout of pipelinesin the room is relatively convenient and reasonable, so that the construction environment is effectively improved, and meanwhile, the field 6S management is facilitated; by forming the through room process hole, the construction is relatively convenient, so that the working efficiency is improved; a route for constructors to enter the room is changed into a straight line, and the ship boarding route is effectively reduced, so that the constructors can conveniently board a ship, and the ship boarding labor hour is effectively shortened; and meanwhile, the bridge crossing ladder can be taken asa fire safety channel, and the constructors can conveniently evacuate in dangerous situations, so that the life and property safeties of the constructors are guaranteed.

Description

technical field [0001] The invention relates to the technical field of ship building technology, in particular to a method for erecting a ship engine room bridge ladder. Background technique [0002] With the development of modern technology, the shipbuilding industry is developing more and more high-end. The original small wooden boat has developed into a 10,000-ton steel ship. When the ship is built in the dock, the engine room area is equipped to form a wall structure. The air pipes and gas lines in the area all pass through the main deck, resulting in chaotic pipeline layout. In the engine room, there are many cross-cutting operations of various types of work, a large number of construction personnel, and poor overall construction conditions, which seriously affect the construction quality and progress of each operation. The construction workers inside generally need to enter the engine room through the erected bridge ladder to carry out operations. [0003] In the prio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B63B27/14
CPCB63B27/14
Inventor 梁俊民
Owner CSSC HUANGPU WENCHONG SHIPBUILDING COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products