Reaming and grouting spiral pile, pile foundation and pile construction method
A screw pile and grouting technology, which is applied in foundation structure engineering, sheet pile walls, buildings, etc., can solve problems such as extrusion, failure to provide gripping force, and inability to fully exert the strength of spiral steel pile materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] Please refer to figure 1 , the present embodiment provides at least one reaming grouting screw pile. The steel pile shaft 100 is divided into a front section 110 , a middle section 120 and a rear section 130 along the length direction. Two helical blades 200 are fixed at intervals on the peripheral side of the front section 110, so that when the pile rod 100 is driven to rotate by a hydraulic power head, the bite force between the two helical blades 200 of the front section 110 and the soil 300 is rotated. A downward force is generated during the process, so that the pile rod 100 can be drilled into the soil layer. The part of the pile shaft 100 between the middle section 120 and the rear section 130 is pre-fixed with an annular reaming plate 500 on the peripheral side by welding or other fixing methods, so that the pile shaft 100 will continuously drill into the soil under the action of the downward force layer, and when the reaming plate 500 is in contact with the so...
Embodiment 2
[0069] Please refer to Figure 8 , this embodiment provides a reaming grouting screw pile. The pile rod 100 is divided into a pilot rod 140 and an extension rod 150 along the length direction. Two helical blades 200 are fixed on one side, and the other end of the extension rod 150 opposite to the pilot rod 140 is used to connect the power head. The part between the blades 200.
[0070] This embodiment at least provides a pile construction method using the above-mentioned reaming and grouting screw pile.
[0071] Connect the hydraulic power head to the end of the pilot rod 140 so that the hydraulic power head can drive the pilot rod 140 to rotate.
[0072] Make the pilot rod 140 close to the helical blade 200 of the soil layer contact with the surface of the soil layer in advance, or even partially bury it, and then start the hydraulic power head to generate output torque, so that the part of the pilot rod 140 fixed with the helical blade 200 is all vertical or inclined. The...
Embodiment 3
[0076] Example 3, please refer to Figure 9 The difference between this embodiment and the second embodiment is that the reaming plate 500 is installed on the extension rod 150 in advance or detachably.