Prefabricated sinking well and assembling method thereof
A technology of prefabricated assembly and assembly method, applied in the field of sink wells, can solve the problems of inconvenient urban traffic and residents' life, difficult quality control, urban road congestion, etc., to reduce the impact of road traffic and residents' lives, and achieve the effect of great application value.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The specific implementation manner of the present invention will be described in detail below in conjunction with the accompanying drawings and preferred embodiments. Such as Figure 1-2 As shown, a prefabricated caisson comprises an inner sleeve 1 and an outer sleeve 2, and the outer sleeve is set on the outside of the inner sleeve, and the inner sleeve and the outer sleeve are respectively composed of several pieces The arc-shaped plate is prefabricated by reinforced concrete in the factory, with grooves 3 and protrusions 4 at both ends of the arc-shaped plate, and a prestressed hole is left between the inner sleeve and the outer sleeve. 5. A prestressed wire rope 6 is installed in the prestressed hole. The arc-shaped plates that make up the inner sleeve and outer sleeve in this device are prefabricated in the factory in advance, and can be assembled very quickly through the protrusions and grooves on both sides. The inner sleeve and outer sleeve between the upper an...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 