A vertical adjustment method for integrated construction of steel pipe columns

A technology of steel pipe columns and steel pipes, which is applied in the vertical adjustment field of integrated construction of steel pipe columns, can solve problems such as low construction efficiency, huge equipment, and unusability, and achieve the effects of improving construction safety, saving installation time, and reducing construction costs

Active Publication Date: 2020-09-01
CHINA RAILWAY FIRST GRP SECOND ENG CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the prior art, in the field of installing the locator on the top of the pile, the steel pipe column is manually drilled into the hole, which is a limited space operation, and the safety is poor
The height of overfilled concrete is not easy to control, and it takes a long time to chisel out overfilled concrete
It is difficult to verify the installation quality of the positioner, it is difficult to guarantee the verticality of the steel pipe column, the process is cumbersome, and the construction efficiency is low
In the field of hydraulic vertical insertion technology, the HPE vertical insertion machine equipment is too large and can only be constructed on the surface, and cannot be used in a narrow space (such as a pilot tunnel)

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A vertical adjustment method for integrated construction of steel pipe columns
  • A vertical adjustment method for integrated construction of steel pipe columns
  • A vertical adjustment method for integrated construction of steel pipe columns

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0013] The preferred embodiment of the vertical adjustment method for steel pipe column integrated construction of the present invention is:

[0014] Use a total station to place the center point of the steel pipe column on the vault of the small pilot tunnel, and place the longitudinal axis of the pile on both sides of the pilot tunnel. The PE line is tied to the center point. After the installation of the steel pipe column is completed, lead this line from the inside of the steel pipe column to the center point of the vault pile, and straighten the line to ensure that the two points are on a straight line. Install the positioning cross line at the upper flange of the steel pipe column, then pull the longitudinal axis where the pile is located, and use a total station to locate the center point of the pile on the longitudinal axis, and finally use the chuck to adjust the position of the steel pipe column so that the center of the column bottom and the column top The four poin...

specific Embodiment

[0058] like Figure 1-Figure 3 As shown, the present invention provides a construction method for integrated vertical adjustment of piles. The construction method uses mechanical rapid integrated construction of piles in a narrow space, thereby improving construction safety.

[0059] The specific technical scheme is as follows:

[0060] 1. Integrated construction and setting out of piles

[0061] Before the construction, use the wire control points in the leading hole, and use the Leica total station TS06 to place points on the center of the construction pile. The laser function of the instrument can be directly placed on the vault, and the cement nails are manually fixed on the vault and made. Good mark.

[0062] There are two longitudinal axes of the columns on both sides of the guide tunnel wall. The vertical distance between the two longitudinal axes should be 1m, and the center point of the columns should be placed on the longitudinal axis and marked.

[0063] Second, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a steel pipe column integrated construction verticality adjusting method. The center point of a steel pipe column is placed at a vault of a small pilot drift by a total station, and pile longitudinal axes are put on the side walls of both sides of the pilot drift; before installing the steel pipe column, a positioning cross wire is installed at a lower opening of the bottommost section of the steel pipe column, and a high-strength PE wire is tied at the center point; after the steel pipe column is installed, the high-strength PE wire is led from the interior of the steel pipe column to the center point of the pile position of the vault, the wire is straightened, and it is ensured that the two points are in a straight line; then a positioning cross wire is installedat a flange of an upper opening of the top section of the steel pipe column, then the longitudinal axis on which the pile position is located is pulled, and the center point of the pile position on the longitudinal axis is positioned with the total station; and finally, the position of the steel pipe column is adjusted by a chuck to enable the four points of the center of the column bottom, the center of the column top, the center of the longitudinal axes and the column center of the vault to be in a straight line, so that the verticality of the steel pipe column can be ensured and the accurate construction location of the steel pipe column can be ensured. The steel pipe column integrated construction verticality adjusting method eliminates multiple traditional processes such as pumping and draining pile hole mud, steel casing and manual positioner installation down the hole, thereby improving construction safety; and construction cost is reduced, and construction efficiency is improved.

Description

technical field [0001] The invention relates to an engineering construction technology, in particular to a vertical adjustment method for integrated construction of a steel pipe column. Background technique [0002] In recent years, with the improvement of municipal facilities, the improvement of the quality of life and the improvement of the environment, the new subway stations in the central area of ​​the city have basically no open, cover and excavation construction conditions, and the newly built subway stations mostly use the hole pile method ("PBA") It was built by underground excavation. At present, there are few studies on the construction sequence of underground excavation stations built by hole pile method, differential settlement of steel pipe columns in underground excavation stations and their impact on structures, and systematic research is needed. [0003] At present, the commonly used installation of steel pipe columns in underground excavation stations most...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/18
CPCE04G21/18E04G21/1841
Inventor 许志忠崔磊马建民张洪军周翠红冯利华刘建华李金涛任全军熊巍许君珍左桂超陈佳蕊
Owner CHINA RAILWAY FIRST GRP SECOND ENG CO LTD