Wall beam unit for prefabricated housing system and connecting structure thereof
A connection structure and prefabricated technology, applied in the direction of walls, building components, building structures, etc., can solve problems such as low efficiency, difficult construction, complex structure, etc., and achieve the effect of avoiding steel works, simple construction, and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Such as figure 1 As shown, a wall beam unit 20 for a prefabricated housing system provided in this embodiment includes: a transverse load-bearing frame, and an enclosure wall 21 arranged outside the transverse load-bearing frame.
[0034] The lateral load-bearing frame includes an upper frame beam 22 placed horizontally on the upper edge of the enclosure wall 21; the two ends of the upper frame beam 22 are respectively provided with connecting ends 22a extending out of the enclosure wall 21; the connecting ends 22a are used for connecting with The vertical load-bearing members in the prefabricated housing system on both sides of the wall beam unit 20 are connected, and the wall beam unit 20 is connected to the vertical load-bearing member through the upper frame beam 22 .
[0035] In addition, an upper connecting structure 23 is provided on the top surface of the upper frame beam 22 for lapping or inserting with the protruding portion of the steel bar on the edge of the...
Embodiment 2
[0042] This embodiment discloses a connection structure of the above-mentioned wall beam unit, which also includes a prefabricated floor slab.
[0043] Such as image 3 As shown, the side of the edge 31 of the prefabricated floor 30 is provided with a reinforcing bar protrusion 33 . The steel bar protruding part 33 is specifically a steel bar collar.
[0044] Such as Figure 4 As shown, the prefabricated residential system is a multi-layer structure. In the height direction, the two adjacent wall beam units 20 include an upper wall beam unit 20a and a lower wall beam unit 20b; the upper wall beam unit 20a is suspended on both sides On the vertical load-bearing member 10, there is a gap between the upper wall beam unit 20a and the lower wall beam unit 20b, and the edge of the prefabricated floor slab extends into the gap.
[0045] Such as Figure 5 As shown, the prefabricated floor 30 is lapped on the upper frame beam 22 of the lower wall beam unit 20b; the studs are insert...