Novel left vertical beam production process
A production process, a new type of technology, applied in the field of new left vertical beam production process, can solve the problems of complex production process of left vertical beam, difficult control of processing size, low processing efficiency, etc., achieve high processing accuracy, easy control, and meet installation requirements Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Embodiment 1, a kind of novel left upright girder production process, comprises the following steps: S1, prepare the left upright girder processing drawing and select 510L type girder plate as raw material; S2, fix the 510L type girder plate on the laser cutting machine, according to Set the processing data on the drawing, cut the through hole and the shape frame, and process the raw material of the flange ear at the same time; S3, fix the forming mold on the four-column hydraulic press; S4, fix the cut raw material on the forming mold, and start the four-column hydraulic press Carry out forming processing; S5, place the raw material of the flange ear on the ear pressing mold, and perform flange processing; S6, use a welding machine to weld the processed flange ear to the material processed in S4 to obtain the left vertical beam.
[0031] In the S1, the left upright beam includes a beam body 1, and the beam body 1 includes a support surface 2, and the side walls of the s...
Embodiment 2
[0038] Embodiment 2, a kind of novel left upright girder production process, comprises the following steps: S1, prepare the left upright girder processing drawing and select 510L type girder plate as raw material; S2, fix the 510L type girder plate on the laser cutting machine, according to Set the processing data on the drawing, cut the through hole and the shape frame, and process the raw material of the flange ear at the same time; S3, fix the forming mold on the four-column hydraulic press; S4, fix the cut raw material on the forming mold, and start the four-column hydraulic press Carry out forming processing; S5, place the raw material of the flange ear on the ear pressing mold, and perform flange processing; S6, use a welding machine to weld the processed flange ear to the material processed in S4 to obtain the left vertical beam.
[0039] In the S1, the left upright beam includes a beam body 1, and the beam body 1 includes a support surface 2, and the side walls of the s...
PUM
| Property | Measurement | Unit |
|---|---|---|
| length | aaaaa | aaaaa |
| height | aaaaa | aaaaa |
| height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 