Positioning frame for pcmw construction method
A positioning frame and construction method technology, which is applied in the direction of basic structure engineering, construction, excavation, etc., can solve the problems of low construction accuracy, easy tilting of PHC pipe piles, and poor construction quality, so as to improve construction quality, improve stability, and ensure construction The effect of precision
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0037] A positioning frame for PCMW construction method, such as figure 1 , including a frame body 1, a vertical guide cylinder 2 is provided in the middle of the frame body 1, and the guide cylinder 2 guides the PHC pipe piles to prevent the PHC pipe piles from tilting and affect the construction accuracy. The guide cylinder 2 is 1-1.5m long, and the guide cylinder 2 has a certain length to guide the PHC pipe pile, preventing the length from being too short and poor guiding effect, and avoiding material waste caused by too long length.
[0038] Such as figure 1 The guide cylinder 2 is provided with a number of clamping mechanisms, which clamp and fix the PHC pipe piles to prevent the PHC pipe piles from shaking in the guide cylinder 2 and affect the construction accuracy.
[0039] Such as figure 1 , There are 12 clamping mechanisms in total, three groups are divided into four groups, and the four groups of clamping mechanisms are evenly arranged on the inner wall of the gui...