Dewatering and recharging construction method of water-rich floury soil land layer
A construction method and stratum technology, applied in the engineering field, can solve the problems of easy blockage of recharge wells, immaturity, inability to coordinate recharge and environmental control around the foundation pit, etc., and achieve the effect of reducing construction costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0031] In order to make the above objects, features and advantages of the present invention more obvious and understandable, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0032] The invention provides a water-rich powdery soil layer precipitation and recharge technology, comprising the following steps:
[0033] The first part is the construction of the recha...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

