Construction method for simultaneously pouring metro rail top air passages and middle plate

A rail-top air duct and construction method technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as small internal space, many reserved holes, hidden safety hazards, etc., achieve large construction space and improve construction quality , to avoid the effect of construction gap

Inactive Publication Date: 2019-01-04
POWERCHINA RAILWAY CONSTR
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the complex structure of the rail top air duct, high construction precision, small internal space, and many reserved holes, it has always been a difficult problem in construction work
[0003] The traditional operation method is to use the post-pouring method for construction. During construction, the concrete is usually poured through the holes reserved in the middle plate. Due to the small space for concrete pouring on the surface o...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for simultaneously pouring metro rail top air passages and middle plate
  • Construction method for simultaneously pouring metro rail top air passages and middle plate
  • Construction method for simultaneously pouring metro rail top air passages and middle plate

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034]In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0035] In order to improve the concrete pouring quality of the vertical wall 3-1 of the rail top air duct and strengthen the integrity of the concrete bonding between the vertical wall 3-1 of the rail top air duct and the middle plate 2, the present invention provides a construction for simultaneous pouring of the rail top air duct and the middle plate method. In order to further illustrate the present invention, elaborate as follows in conjunction with accompanying drawing:

[0036] A construction method for simultaneous pouring of the subway rail top air duct and the mid-slab, firstly carrying out the construction of the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Diameteraaaaaaaaaa
Login to view more

Abstract

The invention discloses a construction method for simultaneously pouring metro rail top air passages and a middle plate, and belongs to the field of tunneling. Construction of a middle plate lower side wall of a station is firstly carried out, and concrete pouring and form removal are completed; and then construction of the rail top air passages and the middle plate is carried out. The rail top air passages and the middle plate are constructed according to the following steps that a, construction of the rail top air passages, a middle plate support except the corresponding position of the railtop air passages, base plate templates and external templates of rail top air passage vertical walls is carried out; b, reinforcing bars of the middle plate base plates except the corresponding position of the rail top air passages, the rail top air passage vertical walls and the rail top air passage base plates are manufactured and installed; c, construction of interior templates of the rail topair passage vertical walls, the base plate templates and middle plate supports of the rail top air passage positions is carried out; d, construction of reinforcing bars of the middle plate is carriedout; e, concrete pouring of the rail top air passages and the middle plate is carried out; and f, form removal is carried out. According to the construction method for simultaneously pouring the metro rail top air passages and the middle plate, the quality of concrete pouring of the rail top air passage vertical wall is ensured, and integrality of concrete bonding of the rail top air passage vertical wall and the middle plate is enhanced.

Description

technical field [0001] The invention belongs to the field of tunnel excavation, and in particular relates to a construction method for simultaneous pouring of a subway rail top air channel and a middle plate. Background technique [0002] The rail top air duct, that is, the train top exhaust duct, is an important internal structural component in the ventilation system of a subway station, and its main function is to ventilate and dissipate heat on the top of the train. The main structure of the rail top air duct includes the vertical wall of the rail top air duct and the bottom plate of the rail top air duct, which are suspended at the junction of the middle plate of the station and the structural side wall. Due to the complex structure of the rail top air duct, high construction precision, small internal space and many reserved holes, it has always been a difficult problem in the construction work. [0003] The traditional operation method is to use the post-pouring method...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D29/045
CPCE02D29/04
Inventor 王天梁杨关军潘南江
Owner POWERCHINA RAILWAY CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products