Road engineering earthwork quantity high-precision calculation method based on BIM technology
A technology of road engineering and calculation method, applied in calculation, image data processing, 3D modeling, etc., can solve the problems of large earthwork error in road engineering and unfavorable refined cost management, so as to improve calculation accuracy and promote refined management , good adaptability effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A high-precision calculation method for road engineering earthwork volume based on BIM technology, comprising the following steps:
[0030] Step 1. Import the original terrain data:
[0031]The first step in calculating the earthwork volume of road engineering is to collect the original terrain DEM data. The DEM data includes two kinds of information, the plane position and the elevation data. For the collection of DEM data, it can be measured directly in the field with a total station or GPS laser rangefinder, or indirectly obtained from aerial images and existing topographic maps.
[0032] Step 2, constructing the digital ground model of the original terrain surface:
[0033] Import the original terrain data obtained in Step 1 into Civil3D, construct a TIN surface in Civil3D, and construct a spatial delaunay TIN. The TIN construction method used here is a two-dimensional projection method, and its construction principle is: the original terrain The DEM data is proje...
Embodiment 2
[0041] A high-precision calculation method for road engineering earthwork volume based on BIM technology is also applicable to the calculation of excavated and filled earthwork volume for site leveling in civil engineering. Since the calculation method proposed by the present invention is universal, its steps and principles Similar to Embodiment 1.
[0042] According to the steps described in Embodiment 1, the digital ground model of the original terrain is constructed, such as Figure 10 shown. The digital ground model of the stitched surface is constructed as Figure 11 Shown; the constructed original terrain 3D model and stitched surface 3D model are shown as Figure 12 and Figure 13 Shown; the common parts of the two 3D models are as Figure 14 shown.
[0043] Similar to the embodiment, when calculating the volume of excavated and filled soil for site leveling, it can be considered that the original surface 3D model is excavated to the public part 3D model, so the ex...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com